Need Name:
ANC TL P - Rehabilitate Taxilane Papa
Type:
AIP/M&O AIP
Community/Economic Development
Funding Source:
Select One
State GF
AIP
M&O AIP
M&O Operating
Stimulus
Local
Bond
N/A
Category:
Select One
APRON
BUILDING
EQUIPMENT
FENCING
GROUND TRANSPORTATION
HELIPAD
LEASING
NEW AIRPORT
OTHER
PLANNING
RUNWAY
SEAPLANE BASE
TAXIWAY
Sub Category:
Select One
Construct Taxiway
Demolish Taxiway
Extend Taxiway
Install Taxiway Lighting
Install Taxiway Sensors
Rehabilitate Taxiway
Rehabilitate Taxiway Lighting
Relocate Taxiway
Strengthen Taxiway
Widen Taxiway
Estimated Cost:
$3,000,000
Description:
Rehabilitate Taxilane (TL) Papa. Improvements include: provide adequate typical section; remove and replace asphalt, evaluate taxiway safety area; replace lighting, markings, and signs; remove, replace and modify existing storm drainage; and adjust utilities as needed.
Priority:
Mid
Need Origination:
Other
Select One
5010
ALP/Master Plan
Community
FAA Initiatives
Inspection
Letter of Compliance
M&O
Other
Sponsor
State Equipment Fleet (SEF)
Justification:
The purpose of this project is to restore the useful life of the TL pavement in this area. This TL was last reconstructed in 2006 and a surface seal was applied in 2021. The Average PCI is 75 as of 2021 inspection. The pavement sees constant use from Papa 1-3 hardstands. The existing asphalt is showing signs of distress including rutting, longitudinal/traverse cracking, and raveling. Continued degradation of the pavement could result in potential damage to aircraft and surface transportation vehicles due to cracks, foreign object debris, and other impediments if the project is not implemented. Not performing this project will allow concrete conditions to deteriorate until the surface cannot support aircraft, thereby making the TL unusable.
Notes:
RE TL IM
Last Edit Date:
2/9/2024 12:34 PM
History Log
Cristin Jones
Need Created
1/18/2024 01:51 PM
Cristin Jones
In Project
1/18/2024 02:00 PM
Ian Rockmoore
Need Created
2/9/2024 12:33 PM
Removed from project.
Ian Rockmoore
In Project
2/9/2024 12:35 PM