Need Overview
Need Name:
ANC - Install Visual Paging System (ADA compliance)
Type:
AIP/M&O AIP
Community/Economic Development
Funding Source:
Select One
State GF
AIP
M&O AIP
M&O Operating
Stimulus
Local
Bond
N/A
Category:
Select One
APRON
BUILDING
EQUIPMENT
FENCING
GROUND TRANSPORTATION
HELIPAD
LEASING
NEW AIRPORT
OTHER
PLANNING
RUNWAY
SEAPLANE BASE
TAXIWAY
Sub Category:
Select One
Acquire Aircraft Deicing Equipment
Acquire ARFF Equipment
Acquire ARFF Safety Equipment
Acquire ARFF Vehicle [Not reqd by Part 139]
Acquire ARFF Vehicle [Reqd by Part 139 only]
Acquire Driver's Enhanced Vision System
Acquire Emergency Generator
Acquire Equipment
Acquire Friction Measuring Equipment
Acquire Interactive Training System
Acquire Snow Removal Equipment
Install Emergency Generator
Install Weather Reporting Equipment
Rehabilitate Emergency Generator
Security Enhancements (Equipment)
VALE GSE Retrofit Pilot Program
VALE Infrastructure
VALE Vehicle
Estimated Cost:
$2,100,000
Description:
Install an estimated 110 monitors and 110 input stations with associated hardware, software and accessories to provide visual paging throughout the South Terminal, South/North Terminal Connector and North Terminal Lobby. We believe our estimate is accurate. However, due to the volatile bidding environment and to ensure most of the project is completed, the work will be split into a base bid (80 monitors and 80 input stations) and 2 additive alternates (30 monitors and 30 input stations). The two additive alternates will extend visual paging to additional North Terminal and Terminal Connector passenger areas with an estimated 30 monitors and 30 input stations.
Priority:
Short
Need Origination:
FAA Initiatives
Select One
5010
ALP/Master Plan
Community
FAA Initiatives
Inspection
Letter of Compliance
M&O
Other
Sponsor
State Equipment Fleet (SEF)
Justification:
The purpose of the project is to meet Americans with Disabilities Act (ADA) compliance requirements to provide an effective means of communicating with people who cannot hear audible announcements, including pages and gate information. This project allows audible announcement replication through a visual paging system. This project will supplement existing audio and visual gate announcement systems.
Notes:
ST EQ MS
Last Edit Date:
2/9/2024 02:05 PM
History Log
Cristin Jones
Need Created
11/3/2023 01:48 PM
Cristin Jones
In Project
11/3/2023 01:48 PM
Ian Rockmoore
Need Created
2/9/2024 02:00 PM
Removed from project.
Ian Rockmoore
In Project
2/9/2024 02:01 PM
Ian Rockmoore
Need Created
2/9/2024 02:04 PM
Removed from project.
Ian Rockmoore
In Project
2/9/2024 02:05 PM