Need Name:
TSA Passenger Screening Expansion
Type:
AIP/M&O AIP
Community/Economic Development
Funding Source:
Select One
State GF
AIP
M&O AIP
M&O Operating
Stimulus
Local
Bond
N/A
Category:
Select One
APRON
BUILDING
EQUIPMENT
FENCING
GROUND TRANSPORTATION
HELIPAD
LEASING
NEW AIRPORT
OTHER
PLANNING
RUNWAY
SEAPLANE BASE
TAXIWAY
Sub Category:
Select One
Acquire Handicap Passenger Lift Device
Construct ARFF Building
Construct Building
Construct Passenger Shelter
Construct Sand and Chemical Storage Building
Construct SREB
Construct Terminal Building
Construct Toilet Facilities
Demolish Building
Expand ARFF Building
Expand Building
Expand Sand and Chemical Storage Building
Expand SREB
Expand Terminal Building
Hazmat Removal
Improve ARFF Building
Improve Building
Improve Sand and Chemical Storage Building
Improve SREB
Improve Terminal Building
Modify ARFF Building
Modify Building
Modify Sand and Chemical Storage Building
Modify SREB
Rehabilitate ARFF Building
Rehabilitate Building
Rehabilitate Sand and Chemical Storage Building
Rehabilitate SREB
Relocate Building
Estimated Cost:
$20,000,000
Description:
The demand/capacity analysis shows a need to expand from the current 6 SSCP lanes to 11 lanes. This significant expansion is driven by increased demand from up-gauging aircraft sizes (replacement of Q-400s and 737 Combi aircraft), the addition of five new gates and lower passenger processing rates for TSA screening due to new procedures. Three SSCP configuration scenarios were evaluated resulting in the recommendation for screening to expand in its current location. The expansion requires construction of a 16,000 SF airside addition and major reconfiguration of the existing space. The expansion also allows for adequate area to support passenger re-composure space as well as future TSA screening equipment layouts such as those associated with the Automated Security Lanes (ASL).
Priority:
Mid
Need Origination:
ALP/Master Plan
Select One
5010
ALP/Master Plan
Community
FAA Initiatives
Inspection
Letter of Compliance
M&O
Other
Sponsor
State Equipment Fleet (SEF)
Justification:
Operations has identified recurring issues in the B Concourse inbound and outbound baggage system capacity. This project will improve the baggage capacity of level 1 of the B Concourse by reorganizing the area and/or adding exterior induction points for use by the ground handlers for wide body aircraft.
Notes:
RE BD IM
Last Edit Date:
11/3/2023 10:00 AM
History Log
Cristin Jones
Need Created
11/3/2023 10:00 AM
Cristin Jones
In Project