Alaska Department of Transportation and Public Facilities
ALASKA AVIATION DATABASE
a component of the
Alaska Aviation System Plan

Need Overview

Need Name: Land Acquisition - Taxiway
Type:
Funding Source:
Category:
Sub Category:
Estimated Cost: $152,500
Description: Acquire property for the new ROFA, OFZ, RPZs associated with the new parallel taxiway and runway shift of 150 feet toward the apron.
Priority: Short
Need Origination: ALP/Master Plan
Justification: The runway is requires line of sight safety mitigation measures. A parallel taxiway is recommended. The Runway Safety Area (RSA) is substandard. Numerous obstructions are located within the existing Obstacle Free Area (OFA), RSA and Object Free Zone (OFZ). The FAA prefers airport land ownership for construction.
Notes: ST, LA, DV
Last Edit Date: 10/5/2023 02:17 PM
History Log
Philana Miles
Need Created
10/5/2023 02:17 PM
Philana Miles
In Project
10/5/2023 04:01 PM