Uploaded Documents
This area contains documents that are not generated by DOT&PF and automatically loaded into the eDocs database. This includes documents produced by local sponsor airports, consultants, cities, boroughs, and other agencies. To add a relevant airport document, go to the bottom of the page.
 
 
DOT&PF eDocs
This section depicts airport information that exists in the DOT&PF eDocs database and shares all files containing an airport Location ID (LOC). To update titles, dates, duplications and or type of document, please access eDocs through the DOT&PF Employee Intranet page. To add new documents into eDocs from this page, fill out all required information at the bottom.
TitleDate IssuedCategorySub Category
Dillingham (DLG) Airport Layout Plan 1991_07_31 7/31/1991 Planning ALP
Dillingham (DLG) Airport Layout Plan 2016_06_08 10/6/2016 Planning ALP
Dillingham FAA ODALS 1985 As-Builts 7/18/1985 Construction As Builts
52289 Dillingham Terminal Apron_Taxiway A and B As-Awarded (2010) 5/21/2010 Construction As Awarded Specs
Dillingham (DLG) Airport Layout Plan_2023_05_23 5/4/2023 Planning ALP
52289 Dillingham DLG Airport Apron, Taxiway A and B As-Built Plans (2010) 5/20/2014 Construction As Builts
Dillingham (DLG) Airport Layout Plan 1981_05_26 5/26/1981 Planning ALP
Dillingham (DLG) Airport Master Plan Appendices (2005) 6/1/2005 Planning Master Plan
Dillingham (DLG) Airport Layout Plan 1991_07_11 7/11/1991 Planning ALP
00283 DLG Dillingham Gate Improvements Asbuilts 11/4/2022 Construction As Builts
Dillingham Airport PCI Inspection (2007) Planning Pavement Condition Report
Dillingham (DLG) Airport Layout Plan_2022_11-25 11/25/2022 Planning ALP
58347 Dillingham Airport Fencing As-Builts (1991) 2/25/1991 Construction As Builts
00104 Dillingham Runway Rehab Asbuilts 4/10/2023 Construction As Builts
57978 Dillingham General Aviation Apron Expansion As-Builts (1993) 1/27/1993 Construction As Builts
51347 Dillingham ARFF Building Construction Plans (1995) 4/4/1995 Construction As Builts
57995 Dillingham Airport Sewer Improvements As-Builts (1992) 3/27/1992 Construction As Builts
53977 Dillingham Paving Improvements As-Builts (1988) 8/22/1988 Construction As Builts
59304 Dillingham Airport Improvements As-Builts (2016) 8/18/2016 Construction As Builts
Dillingham (DLG) Airport Master Plan Environmental Scoping Summary Report (2005) 5/1/2005 Planning Master Plan
Dillingham (DLG) Airport Layout Plan 1986_10_24 10/24/1986 Planning ALP
Dillingham Airport PCI Inspection (2019) Planning Pavement Condition Report
Dillingham (DLG) Airport Master Plan (2005) 6/1/2005 Planning Master Plan
59327 Dillingham Airport Sewer Improvements Phase II As-Builts (1993) 1/27/1993 Construction As Builts
Dillingham (DLG) Airport Layout Plan 2013_06_08 6/8/2013 Planning ALP
Dillingham (DLG) Airport Layout Plan 2012_07_10 Planning ALP
Dillingham Airport PCI Inspection (2004) Planning Pavement Condition Report
8-02-0078-01-72 Dillingham Airport Improvements As-Builts (1976) 9/21/1976 Construction As Builts
Dillingham (DLG) Airport Layout Plan 2003_06_30 4/25/2003 Planning ALP
Dillingham (DLG) Airport Master Plan Technical Memorandum 1 Draft (2002) 6/17/2002 Planning Master Plan/EA
Dillingham Airport PCI Inspection (2016) Planning Pavement Condition Report
Dillingham Airport PCI Inspection (2011) Planning Pavement Condition Report
50928 Dillingham Chemical Storage Building As-Builts (2009) 10/1/2009 Construction As Builts
Dillingham Airport PCI Inspection (2014) Planning Pavement Condition Report
Dillingham (DLG) Draft Airport Master Plan (1985) 12/1/1985 Planning Master Plan
D10442 Dillingham Airport SSB As-Built (1986) 10/3/1986 Construction As Builts
Dillingham (DLG) Airport Layout Plan 1988_10_06 10/6/1988 Planning ALP
6-02-0078-03 Dillingham Airport Improvements As-Builts (1983) 4/25/1983 Construction As Builts
Dillingham (DLG) Airport Master Plan Technical Memorandum 2 Draft (2003) 5/5/2003 Planning Master Plan/EA
52289 Dillingham Terminal Apron_Taxiway A and B (2010) 5/26/2010 Construction As Awarded Plans
53424 Dillingham Runway Rehabilitation As-Builts (2006) 5/2/2006 Construction As Builts