Facilities
General
Runways/Helipads
PCI/Surface Condition
Buildings/Equipment
Services/Navcom
Statistics
CIMP Inspection
Needs
Documents/Links
Facility Photos
Performance Measures
PFAS
AIP Grants
NOTAMs
Contacts
Need Overview
Need Name:
Rehab Pavements Terminal & GA Aprons
Type:
AIP/M&O AIP
Community/Economic Development
Funding Source:
Select One
State GF
AIP
M&O AIP
M&O Operating
Stimulus
Local
Bond
N/A
Category:
Select One
APRON
BUILDING
EQUIPMENT
FENCING
GROUND TRANSPORTATION
HELIPAD
LEASING
NEW AIRPORT
OTHER
PLANNING
RUNWAY
SEAPLANE BASE
TAXIWAY
Sub Category:
Select One
Construct Apron
Construct Blast Pad
Construct Hard Stands
Demolish Apron
Expand Apron
Install Apron Lighting
Rehabilitate Apron
Relocate Apron
Strengthen Apron
Estimated Cost:
$17,924,095
Description:
Rehabilitate pavement for the General Aviation and Air Carrier aprons.
Priority:
Short
Need Origination:
Inspection
Select One
5010
ALP/Master Plan
Community
FAA Initiatives
Inspection
Letter of Compliance
M&O
Other
Sponsor
State Equipment Fleet (SEF)
Justification:
Pavement Surfaces are required to be free of surface variations, cracking, and deterioration (IAW AC 150/5380-6C). There are weeds growing through the pavement. The GA apron pavement is more than 30 years old. The West Terminal Apron will be 18 years old in 2027 and the PCI will likely call for rehabilitation.
Notes:
Last Edit Date:
10/2/2023 11:54 AM
History Log
Paul Khera
In Project
5/23/2022 02:42 PM
Paul Khera
Need Created
10/2/2023 11:39 AM
Removed from project.
Paul Khera
In Project
10/2/2023 01:17 PM
Inspection Photos