State of Alaska official logo Skip to main content
dot-seal
Alaska Department of Transportation and Public Facilities
ALASKA AVIATION DATABASE
a component of the
Alaska Aviation System Plan
aasp-logo

DILLINGHAM: Documents/Links

 
Uploaded Documents
This area contains documents that are not generated by DOT&PF and automatically loaded into the eDocs database. This includes documents produced by local sponsor airports, consultants, cities, boroughs, and other agencies. To add a relevant airport document, go to the bottom of the page.
 
 
DOT&PF eDocs
This section depicts airport information that exists in the DOT&PF eDocs database and shares all files containing an airport Location ID (LOC). To update titles, dates, duplications and or type of document, please access eDocs through the DOT&PF Employee Intranet page. To add new documents into eDocs from this page, fill out all required information at the bottom.
DOT&PF eDocs
TitleDate IssuedCategorySub Category
Dillingham (DLG) Airport Master Plan Appendices (2005) 6/1/2005 Planning Master Plan
Dillingham (DLG) Airport Master Plan Technical Memorandum 2 Draft (2003) 5/5/2003 Planning Master Plan/EA
Dillingham (DLG) Airport Master Plan (2005) 6/1/2005 Planning Master Plan
Dillingham (DLG) Draft Airport Master Plan (1985) 12/1/1985 Planning Master Plan
Dillingham (DLG) Airport Master Plan Environmental Scoping Summary Report (2005) 5/1/2005 Planning Master Plan
Dillingham (DLG) Airport Master Plan Technical Memorandum 1 Draft (2002) 6/17/2002 Planning Master Plan/EA
Dillingham (DLG) Airport Layout Plan 2003_06_30 4/25/2003 Planning ALP
Dillingham (DLG) Airport Layout Plan 2012_07_10 Planning ALP
51347 Dillingham ARFF Building Construction Plans (1995) 4/4/1995 Construction As Builts
59304 Dillingham Airport Improvements As-Builts (2016) 8/18/2016 Construction As Builts
Dillingham Airport PCI Inspection (2007) Planning Pavement Condition Report
Dillingham Airport PCI Inspection (2004) Planning Pavement Condition Report
Dillingham Airport PCI Inspection (2011) Planning Pavement Condition Report
Dillingham Airport PCI Inspection (2014) Planning Pavement Condition Report
Dillingham Airport PCI Inspection (2016) Planning Pavement Condition Report
58347 Dillingham Airport Fencing As-Builts (1991) 2/25/1991 Construction As Builts
D10442 Dillingham Airport SSB As-Built (1986) 10/3/1986 Construction As Builts
53424 Dillingham Runway Rehabilitation As-Builts (2006) 5/2/2006 Construction As Builts
8-02-0078-01-72 Dillingham Airport Improvements As-Builts (1976) 9/21/1976 Construction As Builts
52289 Dillingham Terminal Apron_Taxiway A and B As-Awarded (2010) 5/21/2010 Construction As Awarded Specs
52289 Dillingham DLG Airport Apron, Taxiway A and B As-Built Plans (2010) 5/20/2014 Construction As Builts
52289 Dillingham Terminal Apron_Taxiway A and B (2010) 5/26/2010 Construction As Awarded Plans
50928 Dillingham Chemical Storage Building As-Builts (2009) 10/1/2009 Construction As Builts
57995 Dillingham Airport Sewer Improvements As-Builts (1992) 3/27/1992 Construction As Builts
59327 Dillingham Airport Sewer Improvements Phase II As-Builts (1993) 1/27/1993 Construction As Builts
57978 Dillingham General Aviation Apron Expansion As-Builts (1993) 1/27/1993 Construction As Builts
53977 Dillingham Paving Improvements As-Builts (1988) 8/22/1988 Construction As Builts
Dillingham FAA ODALS 1985 As-Builts 7/18/1985 Construction As Builts
6-02-0078-03 Dillingham Airport Improvements As-Builts (1983) 4/25/1983 Construction As Builts
Dillingham (DLG) Airport Layout Plan 1986_10_24 10/24/1986 Planning ALP
Dillingham (DLG) Airport Layout Plan 1981_05_26 5/26/1981 Planning ALP
Dillingham (DLG) Airport Layout Plan 1988_10_06 10/6/1988 Planning ALP
Dillingham (DLG) Airport Layout Plan 1991_07_11 7/11/1991 Planning ALP
00283 DLG Dillingham Gate Improvements Asbuilts 11/4/2022 Construction As Builts
Dillingham (DLG) Airport Layout Plan 2013_06_08 6/8/2013 Planning ALP
Dillingham (DLG) Airport Layout Plan 1991_07_31 7/31/1991 Planning ALP
Dillingham (DLG) Airport Layout Plan 2016_06_08 10/6/2016 Planning ALP
Dillingham Airport PCI Inspection (2019) Planning Pavement Condition Report
Dillingham (DLG) Airport Layout Plan_2022_11-25 11/25/2022 Planning ALP
Dillingham (DLG) Airport Layout Plan_2023_05_23 5/4/2023 Planning ALP
00104 Dillingham Runway Rehab Asbuilts 4/10/2023 Construction As Builts
Dillingham Airport PCI Inspection (2023) Planning