Alaska Department of Transportation and Public Facilities
ALASKA AVIATION DATABASE
a component of the
Alaska Aviation System Plan

NUIQSUT: AIP Grants

Base Information
Owner: NORTH SLOPE BOROUGH
NPIAS: 02-0366
Airport Use: Public
Type: Airport
FAA Associated City: NUIQSUT
DOT&PF Region: ---
DOT Owned: False
Facility Status: Active
Filter +/-
Federal Fiscal Year (FFY):
Purpose:    
Purpose Definition
CA Capacity
EN Environment
OT Other
PL Planning
RC Reconstruction
RE Rehabilitate
SA Safety/Security
SB State Block Grant Program
SE Security Enhancements
SP Statutory Emphasis Programs
ST Standards
Component:    
Component Definition
RW Runway Projects
TW Taxiway Projects
AP Apron Projects
TE Terminal Projects
BD Building Projects (other than terminals)
GT Ground Transportation Projects
EQ Equipment, Security, and Fencing
OT Other Projects
LA Land Acquisition (other than noise land)
NA New Airport Projects
PL Planning Projects
SB Seaplane Base Projects
HE Heliport/Helipad Projects
VT Vertiport Projects
HO Noise Projects (other than planning)
PB Noise Mitigation Measures for Public Buildings
Type:    
Type Definition
60 Noise Mitigation Measures for Residences outside 65 DNL
65 Noise Mitigation Measures for Residences within 65 - 69 DNL
70 Noise Mitigation Measures for Residences within 70 - 74 DNL
75 Noise Mitigation Measures for Residences within 75 DNL
AC Access
AQ Acquire Existing Airport
CO Construct
DI Deicing
DV Development
ES Environment Sustainable
EX Extend
FF Fuel Farm
FR Groove Runway
IM Improve
Type Definition
IN Install Instruments
LI Lighting
MA Master Planning
ME Metropolitan System Plan
MS Miscellaneous
MT Environmental Mitigation
NO Noise
OB Obstructions
PA Parking
PM People Mover
PR On-Airport Energy Production
RF Rescue & Fire Fighting
RL Rail
SE Security Enhancements
Type Definition
SF Safety Area
SG Guidance Signs
SN Snow Removal
SR Sensors
ST State System Plan
SV Service Road
SZ Acquire land/easement for approaches
VI Vertical/Visual Guidance System
VT Conduct Vertiport Plan
WH Wildlife Hazard Assessments
WR Construct Wash Rack
WX Install Weather Reporting Equipment
ZE Zero Emissions Vehicle/Infrastructure
Grant Agreement Date:
to
Status:
 
 
Grant Summary Statistics
Total Grants: 8
Total Number of Grant Work Codes: 19 Total Grants: $20,103,817.00
Total Number of Open Grant Work Codes: 16 Total Open Grants: $18,777,123.00
Total Number of Closed Grant Work Codes: 3 Total Closed Grants: $1,326,694.00
 
AIP Grant Listing
The following listing displays all grants since the initiation of the Airport Improvement Program in 1982, most recent to oldest, with the exception of the current federal fiscal year. Grant Agreement Date refers to the date the grant was initiated, Closeout Submitted to FAA notes the date DOT&PF staff submitted a closeout package for review, and Grant Close Date is the official grant closure date, as reported by the FAA. Total cost below includes all AIP funding types (entitlement, discretionary, etc.).
Additional details are exportable into Excel or by going to Reports >> AIP Grants.
FFY    Grant Number    

Each Airport Improvement Program (AIP) grant has a distinct number from the beginning of the program in 1982 to present day. All grants are for the planning and development of public-use airports included in the National Plan of Integrated Airport Systems (NPIAS).

3-02-0000-024-2018 FAA Region (Alaskan)

3-02-0000-024-2018 Airport NPIAS number, assigned to all NPIAS airports starting with 0001 for Adak. 0200 is used for various multi-airport grants (such as pavement marking, various surface maintenance, etc.) and 0000 is used for State System Grants such as the statewide system planning grant.

3-02-0000-024-2018 Grant Sequence Number (this is the 24th grant at this facility)

3-02-0000-024-2018 Federal Fiscal Year Grant Awarded

Work Code    

FAA defines project work codes as a 6-character alpha identifier consisting of three 2-character elements that express purpose, component and type, represents specific airport development and is used in the national priority system equation to produce a numerical rating. Each 2-character alpha identifier may be assigned a value ranging from 0 to 10.

(1) The purpose (P) identifier signifies the underlying objective of an airport development project (e.g., reconstruct, planning, safety). There are approximately 13 purpose identifiers.

(2) The component (C) identifier signifies the physical component (e.g., runway, airfield, planning), for which the development is intended. There are approximately 31 component identifiers.

(3) The type (T) identifier signifies the actual work being done (e.g., expand/extend, construct, update). There are approximately 61 type identifiers.

More information is available in the FAA Order 5090.5, Formulation of the NPIAS and ACIP.

Project DescriptionGrant Agreement DateCloseout Submitted to FAAGrant Close DateTotal
2022 3-02-0366-006-2022 CV RG GN General ARPA 12/14/2021 $32,000
2021 3-02-0366-005-2021 CV CR GN CRRSA Act Funds 8/12/2021 $13,000
2018 3-02-0366-004-2018 ST AP LI Install Apron Edge Lights Install Apron Edge Lights Phase 2 8/30/2018 $800,000
2018 3-02-0366-004-2018 RC RW LI Reconstruct Runway Lighting 05/23 Replace HIRL with MIRL 8/30/2018 $1,028,125
2018 3-02-0366-004-2018 RC TW LI Reconstruct Taxiway Lighting Reconstruct Taxiway Lighting 8/30/2018 $400,000
2018 3-02-0366-004-2018 RE AP IM Rehabilitate Apron Rehabilitate Apron (Phase 2 Construction) 8/30/2018 $1,130,000
2018 3-02-0366-004-2018 RE RW IM Rehabilitate Runway 05/23 Rehabilitate Runway 5/23 (Phase 3 Construction) 8/30/2018 $5,810,739
2018 3-02-0366-004-2018 RE TW IM Rehabilitate Taxiway Rehabilitate Taxiway (Phase 2 Construction) 8/30/2018 $1,250,000
2017 3-02-0366-003-2017 RE TW IM Rehabilitate Taxiway Rehabilitate Taxiway (Phase 1 Material Procurement and Haul) 9/8/2017 2/9/2021 $270,000
2017 3-02-0366-003-2017 RE RW IM Rehabilitate Runway 05/23 Reconstruct Runway 5/23 (Phase 2 Material Extraction and Haul) 9/8/2017 2/9/2021 $4,791,627
2017 3-02-0366-003-2017 RE AP IM Rehabilitate Apron Rehabilitate Apron (Phase 1 Material Excavation and Haul) 9/8/2017 2/9/2021 $780,000
2017 3-02-0366-003-2017 ST AP LI Install Apron Lighting Install Apron Flood Lighting 9/8/2017 2/9/2021 $82,000
2017 3-02-0366-003-2017 ST EQ LI Install Emergency Generator Install Emergency Generator 9/8/2017 2/9/2021 $300,000
2017 3-02-0366-003-2017 ST OT IN Install Miscellaneous NAVAIDS Install airport beacon, primary and secondary wind cones and segmented circle 9/8/2017 2/9/2021 $800,000
2017 3-02-0366-003-2017 ST OT IM Improve Airport Miscellaneous Improvements Install Airfield Lighting Vault 9/8/2017 2/9/2021 $165,000
2016 3-02-0366-002-2016 RE RW IM Rehabilitate Runway 05/23 Rehabilitate Runway 5/23, Apron, and Taxiway (Phase 1 Design) 9/20/2016 $1,124,632
2010 3-02-0200-076-2010 PL PL VI [Various Grant] Conduct aeronautical survey for WAAS approach Conduct Aeronautical Survey, Phase II 9/13/2010 10/12/2017 $41,452
2008 3-02-0200-064-2008 PL PL VI [Various Grant] Conduct aeronautical survey for WAAS approach 6/18/2008 10/27/2014 $199,000
2000 3-02-0366-001-2000 ST RW SF Improve Runway Safety Area 9/26/2000 9/10/2003 $1,086,242