COLD BAY: Airport Needs List

Filter +/-
Needs Funding Source:
Status:
Need Category:
 
ASAP Needs Total:   Short Term Needs Total:
Mid Term Needs Total: Long Term Needs Total:
All Needs Total: Needs in Project Total:
Number of Needs: Number of Needs in Project:
 
NeedsPriorityNeed OriginationFunding SourceStatusEstimated CostLast Edit DateLast Verified Date
Strengthen Apron Pavement
Strengthen Apron Pavement
Long FAA Initiatives AIP In Project $5,304,500 7/16/2019 
Apron Projects: RC AP IM : Reconstruct Apron
South Ramp Reconnections for buried fuel tanks
Short M&O AIP Need Created $15,999,999 7/17/2026 
Equipment, Security, and Fencing: SA EQ RF : Acquire Safety and/or Security Equipment
Excavator or Skid Steer with brush cutter head
Short M&O AIP Need Created $299,999 7/17/2026 
Install Continuously Operating Reference Stations (CORS)
Install Continuously Operating Reference Stations (CORS)
Short Sponsor Stimulus Need Created $75,000 3/24/2022 
Revenue Generation -New Lease Lots
Revenue Generation -New Lease Lots
Short Community N/A Need Created 3/7/2024 
Cold Bay Loader
Cold Bay Loader
Short State Equipment Fleet (SEF) AIP Obligated Need $444,960 3/17/2021 
Construct New Chemical Storage Building
Construct New Chemical Storage Building
Mid Other AIP Obligated Need $5,702,080 2/10/2021 
Equipment, Security, and Fencing: SA EQ AQ : Acquire Aircraft Rescue and Fire Fighting Safety Equipment
Acquire replacement water rescue rafts
Short Letter of Compliance AIP Obligated Need $36,392 7/15/2026 
Equipment, Security, and Fencing: SA EQ RF : Acquire Aircraft Rescue & Fire Fighting Vehicle
ARFF Vehicle
Short Other AIP Obligated Need $1,276,741 7/15/2026 
Replace with 4600 Tracking Broom
Replace with 4600 Tracking Broom
Short Other AIP Obligated Need $844,600 4/22/2021 
Runway Projects: RS RW IM : Reseal/Resurface Runway Pavement
Crack Seal
Short M&O AIP Obligated Need $140,625 7/15/2026 
Runway Projects: RS RW IM : Reseal/Resurface Runway Pavement
Pavement Marking & Crack Seal (2028)
Mid M&O AIP Obligated Need $235,000 7/22/2026 
Add One Man Gate
Add One Man Gate
ASAP Sponsor AIP Programmed Need $17,707 9/27/2022 
Apron Projects: RE AP SG : Rehabilitate Apron Markings
Painted Markings 2029
Mid M&O AIP Programmed Need $20,000 7/17/2026 
Full Perimeter Fence with Buried Skirt
Full Perimeter Fence with Buried Skirt
ASAP Letter of Compliance AIP Programmed Need $12,736,841 4/29/2024 
Remove One Vehicle Gate
Remove One Vehicle Gate
ASAP Sponsor AIP Programmed Need $4,769 9/27/2022 
Replace 2 Man Gates
Replace 2 Man Gates
ASAP Sponsor AIP Programmed Need $26,153 9/27/2022 
Replace 5 Vehicle Gates
Replace 5 Vehicle Gates
ASAP Letter of Compliance AIP Programmed Need $719,780 9/27/2022 
Replace Gates E1 to E5
Replace Gates E1 to E5
ASAP Sponsor AIP Programmed Need $719,780 8/8/2023 
Runway Projects: RE RW IM : Rehabilitate Runway
Painted Markings 2029
Mid M&O AIP Programmed Need $150,000 2/10/2026 
Runway Projects: RS RW IM : Reseal/Resurface Runway Pavement
Pavement Marking & Crack Seal (2027)
Mid M&O AIP Programmed Need $180,000 9/17/2025 
Runway Projects: RS RW IM : Reseal/Resurface Runway Pavement
Pavement Marking & Crack Seal (2027)
Mid M&O AIP Programmed Need $180,000 9/17/2025 
Taxiway Projects: RE TW IM : Rehabilitate Taxiway
Painted Markings 2029
Mid M&O AIP Programmed Need $10,000 2/10/2026 
      Total   