Needs | Priority | Need Origination | Funding Source | Status | Estimated Cost | Last Edit Date | Last Verified Date |
Acquire Loader
Acquire Loader
|
Mid
|
M&O
|
AIP
|
In Project
|
$460,000
| 3/15/2023 | |
Acquire replacement water rescue rafts
Acquire replacement water rescue rafts
|
Short
|
Letter of Compliance
|
AIP
|
In Project
|
$36,392
| 3/17/2021 | |
Apron A Rehabilitation
Apron A Rehabilitation
|
Short
|
Inspection
|
AIP
|
In Project
|
$4,370,908
| 10/7/2022 | |
Apron B Rehabilitation
Apron B Rehabilitation
|
Short
|
Inspection
|
AIP
|
In Project
|
$4,370,908
| 10/7/2022 | |
EMAS
EMAS
|
ASAP
|
ALP/Master Plan
|
AIP
|
In Project
|
$16,611,000
| 10/6/2022 | |
Fence and Gate Repair
Fence and Gate Repair
|
Short
|
ALP/Master Plan
|
AIP
|
In Project
|
$156,259
| 10/6/2022 | |
Replace 2 drive through gates
Replace 2 drive through gates
|
Short
|
M&O
|
AIP
|
In Project
|
$184,670
| 10/6/2022 | |
Replace Traffic Gates
Replace Traffic Gates
|
Short
|
ALP/Master Plan
|
AIP
|
In Project
|
$228,800
| 10/6/2022 | |
Reroute Airport Beach Rd
Reroute Airport Beach Rd
|
Short
|
ALP/Master Plan
|
AIP
|
In Project
|
$4,319,120
| 10/6/2022 | |
Update Airport Master Plan
Update Airport Master Plan
|
ASAP
|
Community
|
AIP
|
In Project
|
$725,120
| 2/12/2021 | |
Install Continuously Operating Reference Stations (CORS)
Install Continuously Operating Reference Stations (CORS)
|
Short
|
Sponsor
|
Stimulus
|
Need Created
|
$75,000
| 3/24/2022 | |
Ramp Erosion Control
Ramp Erosion Control
|
Short
|
M&O
|
AIP
|
Need Created
|
$7,000,000
| 11/7/2023 | |
Procure AFFF Testing Equipment
Procure AFFF Testing Equipment
|
ASAP
|
FAA Initiatives
|
AIP
|
Obligated Need
|
$24,000
| 7/12/2023 | |
Runway Projects: RS RW IM : Reseal/Resurface Runway Pavement
Pavement Markings (2024)
|
ASAP
|
Other
|
AIP
|
Obligated Need
|
$108,179
| 2/7/2025 | |
Embankment Protection at Center Southside RW
Embankment Protection at Center Southside RW
|
ASAP
|
Other
|
AIP
|
Programmed Need
|
$21,784,500
| 2/15/2024 | |
Expand Terminal Apron
Expand Terminal Apron
|
Short
|
FAA Initiatives
|
AIP
|
Programmed Need
|
$1,500,000
| 2/15/2024 | |
Fix the rest of the fence
Fix the rest of the fence
|
Short
|
Letter of Compliance
|
AIP
|
Programmed Need
|
$850,000
| 2/15/2024 | |
Improve Drainage
Improve Drainage
|
Short
|
M&O
|
AIP
|
Programmed Need
|
$6,000,000
| 2/15/2024 | |
Improve RSA
Improve RSA
|
Short
|
FAA Initiatives
|
AIP
|
Programmed Need
|
$5,500,000
| 2/15/2024 | |
Replace Rotating Beacon
Replace Rotating Beacon
|
ASAP
|
M&O
|
AIP
|
Programmed Need
|
$500,000
| 2/15/2024 | |
Replace Runway Lights
Replace Runway Lights
|
Short
|
Sponsor
|
AIP
|
Programmed Need
|
$1,100,000
| 2/15/2024 | |
Replace segmented circle
Replace segmented circle
|
Short
|
Letter of Compliance
|
AIP
|
Programmed Need
|
$500,000
| 2/15/2024 | |
Runway Projects: RC RW IM : Reconstruct Runway
Pavement Markings (2028)
|
Mid
|
M&O
|
AIP
|
Programmed Need
|
$100,000
| 2/7/2025 | |
| | | | |
Total
| | |