Return to Alaska ASP
Alaska Department of Transportation and Public Facilities
ALASKA AVIATION DATABASE
a component of the
Alaska Aviation System Plan
Facilities
Reports
Dashboard
>
Facilities
General
Runways/Helipads
PCI/Surface Condition
Buildings/Equipment
Services/Navcom
Statistics
CIMP Inspection
Needs
Documents/Links
Facility Photos
Performance Measures
PFAS
AIP Grants
NOTAMs
Contacts
Need Overview
Need Name:
Replace Gates E1 to E5
Type:
AIP/M&O AIP
Community/Economic Development
Funding Source:
Select One
State GF
AIP
M&O AIP
M&O Operating
Stimulus
Local
Bond
N/A
Category:
Select One
APRON
BUILDING
EQUIPMENT
FENCING
GROUND TRANSPORTATION
HELIPAD
LEASING
NEW AIRPORT
OTHER
PLANNING
RUNWAY
SEAPLANE BASE
TAXIWAY
Sub Category:
Select One
Extend Fencing
Install Fencing/Gates
Install Perimeter Fencing
Relocate Fencing
Repair Fencing/Gates
Estimated Cost:
$719,780
Description:
Replace 5 vehicle gates that run on electric power
Priority:
ASAP
Need Origination:
Sponsor
Select One
5010
ALP/Master Plan
Community
FAA Initiatives
Inspection
Letter of Compliance
M&O
Other
Sponsor
State Equipment Fleet (SEF)
Justification:
Gates are worn due to elements and wind. They no longer close properly allowing entry for wildlife and unauthorized persons. Electric gates are not AIP eligible at this airport. The new gates must be manual.
Notes:
RC OT MS
Last Edit Date:
8/8/2023 08:24 AM
History Log
Paul Khera
Need Created
9/27/2022 11:55 AM
Paul Khera
In Project
9/27/2022 11:55 AM
Rebecca Douglas
Need Created
8/8/2023 08:20 AM
Removed from project.
Rebecca Douglas
In Project
8/8/2023 08:25 AM