Return to Alaska ASP
Alaska Department of Transportation and Public Facilities
ALASKA AVIATION DATABASE
a component of the
Alaska Aviation System Plan
Facilities
Reports
Air Carriers
Dashboard
>
Facilities
General
Runways/Helipads
PCI/Surface Condition
Buildings/Equipment
Services/Navcom
Statistics
CIMP Inspection
Needs
Documents/Links
Facility Photos
Performance Measures
PFAS
AIP Grants
NOTAMs
Communities
Contacts
Need Overview
Need Name:
Replace 5 Vehicle Gates
Common Name:
Replace 5 Vehicle Gates
Type:
AIP
Community/Economic Development
M&O Operating
Funding Source:
Select One
State GF
AIP
M&O Operating
Stimulus
N/A
Category:
Select One
Access Road
Airfield
Airport Master Planning
Apron
Building
Building and Equipment
Equipment
Fence
Heliport/Helipad
Homes
Land
New Airport
Other
People Mover
Planning
Privatizaton Planning
Public Building
Revenue Producing
Runway
Seaplane Base
Service/Perimeter Road
State/Regional Planning
Taxilane
Taxiway
Terminal
Sub Category:
Select One
Location Type:
Select One
General Information
Building
Runway
Taxiway
Apron
Access Road
Equipment
Seaplane Base
Airport Leasing
Location:
N/A
Estimated Cost:
$719,780
Description:
Replace five vehicle gates with manual gates that have the ability to be locked and fitted with automatic gate devices.
Priority:
ASAP
Need Origination:
Letter of Compliance
Select One
5010
ALP/Master Plan
Community
FAA Initiatives
Inspection
Letter of Compliance
M&O
Other
Sponsor
State Equipment Fleet (SEF)
Justification:
The existing gates are always open because the wind and other conditions have bent them out of shape.
Notes:
RC OT MS
Last Edit Date:
9/27/2022 10:24 AM
History Log
Paul Khera
Need Created
9/27/2022 10:24 AM
Paul Khera
In Project
9/27/2022 11:09 AM