Alaska Department of Transportation and Public Facilities
ALASKA AVIATION DATABASE
a component of the
Alaska Aviation System Plan

Need Overview

Need Name: Reconstruct Apron, Replace Storm Drain on the Apron & TW F
Type:
Funding Source:
Category:
Sub Category:
Estimated Cost: $11,892,689
Description: Reconstruct the pavement surfaces and replace the storm drainage on the Apron and Taxiway F (north). The existing structural section does not include a stabilized base and the pavement surface shows considerable rutting. The reconstructed structural section will include a stabilized base as required by AC 150-5320/6F for aircraft over 100,000 lbs. The drainage system within the footprint of the Apron and Taxiway F dates from original construction and has deteriorated to the point where replacement is necessary.
Priority: Short
Need Origination: Inspection
Justification: Pavement has major cracking. Reports of FOD coming from the cracks in the pavement.
Notes:
Last Edit Date: 8/8/2022 11:37 AM
History Log
Rebecca Douglas
Need Created
8/8/2022 11:35 AM
Removed from project.
Rebecca Douglas
In Project
8/8/2022 11:38 AM

Inspection Photos