Return to Alaska ASP
Alaska Department of Transportation and Public Facilities
ALASKA AVIATION DATABASE
a component of the
Alaska Aviation System Plan
Facilities
Reports
Dashboard
>
Facilities
General
Runways/Helipads
PCI/Surface Condition
Buildings/Equipment
Services/Navcom
Statistics
CIMP Inspection
Needs
Documents/Links
Facility Photos
Performance Measures
PFAS
AIP Grants
NOTAMs
Contacts
Need Overview
Need Name:
Runway 9/27 Tree Removal
Type:
AIP/M&O AIP
Community/Economic Development
Funding Source:
Select One
State GF
AIP
M&O AIP
M&O Operating
Stimulus
Local
Bond
N/A
M&O Activity:
Aircraft Rescue & Firefighting Equipment
Buildings
Crack Sealing
Drainage Maintenance & Repair
Dust Control
Embankment Stabilization
Erosion Control
Fence and Gate Repair/Replacement/Installation
Flexible Threshold Markers
Lighting Repair/Replacement
Minor Gravel Resurfacing
Minor Pavement Repair
Obstruction Removal
Pavement Markings
Replacement of Visual Aids
Runway Grading
Safety Areas
Snow Removal Equipment
Stability Control
Vegetation Control
Estimated Cost:
$132,538
Description:
Remove trees that penetrate Part 77 surfaces
Priority:
Short
Need Origination:
Inspection
Select One
5010
ALP/Master Plan
Community
FAA Initiatives
Inspection
Letter of Compliance
M&O
Other
Sponsor
State Equipment Fleet (SEF)
Justification:
2016 CIMP
Notes:
Duane Hoskins 2/11/2019
Last Edit Date:
4/15/2022 08:17 AM
History Log
Inspection Photos