Return to Alaska ASP
Alaska Department of Transportation and Public Facilities
ALASKA AVIATION DATABASE
a component of the
Alaska Aviation System Plan
Facilities
Reports
Air Carriers
Dashboard
>
Facilities
General
Runways/Helipads
PCI/Surface Condition
Buildings/Equipment
Services/Navcom
Statistics
CIMP Inspection
Needs
Documents/Links
Facility Photos
Performance Measures
PFAS
AIP Grants
NOTAMs
Communities
Contacts
Need Overview
Need Name:
Pavement Markings (M&O SPM)
Common Name:
Pavement Markings (M&O SPM)
Type:
AIP
Community/Economic Development
M&O Operating
Funding Source:
Select One
State GF
AIP
M&O Operating
Stimulus
N/A
Category:
Select One
Access Road
Airfield
Airport Master Planning
Apron
Building
Building and Equipment
Equipment
Fence
Heliport/Helipad
Homes
Land
New Airport
Other
People Mover
Planning
Privatizaton Planning
Public Building
Revenue Producing
Runway
Seaplane Base
Service/Perimeter Road
State/Regional Planning
Taxilane
Taxiway
Terminal
Sub Category:
Select One
RC RW IM: Reconstruct Runway
RC RW IN: Reconstruct Instrument Approach Aid
RC RW LI: Reconstruct Runway Lighting
RC RW SF: Reconstruct Engineered Material Arresting System
RC RW SG: Reconstruct Runway Signage
RC RW VI: Reconstruct Runway Visual Guidance System
RE RW IM: Rehabilitate Runway
RE RW LI: Rehabilitate Runway Lighting
RE RW SG: Rehabilitate Runway Markings
RS RW IM: Reseal/Resurface Runway Pavement
SA RW FR: Install Runway Grooving/Porous Friction Course
SA RW OB: Hazard Marking\Lighting\Removal
SA RW SF: Construct Engineered Material Arresting System
SA RW SF: Construct/Extend Safety Area
SA RW SG: Install Runway Signage/Markings
SA RW VI: Install Runway Visual Guidance System
ST RW CO: Construct Runway
ST RW IM: Realign Runway
ST RW IM: Strengthen Runway
ST RW IN: Install Instrument Approach Aid
ST RW LI: Install Runway Lighting
ST RW OB: Obstruction Marking\Lighting\Removal
ST RW SH: Shift Runway
Location Type:
Select One
General Information
Building
Runway
Taxiway
Apron
Access Road
Equipment
Seaplane Base
Airport Leasing
Location:
N/A
Estimated Cost:
$105,029
Description:
Maintain pavement markings (M&O SPM); R&R Marking RWY 13/31, ( 4,500 LF) & TWY (432 LF) Apron (25,480 SY.)
Priority:
ASAP
Need Origination:
Other
Select One
5010
ALP/Master Plan
Community
FAA Initiatives
Inspection
Letter of Compliance
M&O
Other
Sponsor
State Equipment Fleet (SEF)
Justification:
Annual pavement marking maintenance, Surface Preventative maintenance
Notes:
Last Edit Date:
1/27/2022 01:36 PM
History Log
Rebecca Douglas
In Project
1/27/2022 01:36 PM
Kari Hebert
Obligated Need
8/20/2024 11:06 AM