Need Overview

Need Name: Point Hope Airport Runway Realignment
Type:
Funding Source:
Category:
Sub Category:
Estimated Cost: $14,314,723
Description: Realign the runway at the Point Hope Airport.
Priority: Mid
Need Origination: Other
Justification: The Point Hope Airport is in danger of damage to the runway and runway safety area due to active beach erosion. Realigning the runway will extend the life of the facility.This project was scored at the November 2000 APEB-Airfield evaluation meeting as the Point Hope Airport Erosion Control Project (score: 96).