POINT HOPE
:
Airport Needs List
Owner:
ALASKA DOT&PF NORTHERN REGION
NPIAS:
02-0226
Airport Use:
Public
Type:
Airport
FAA Associated City:
POINT HOPE
DOT&PF Region:
Northern
DOT Owned:
True
Facility Status:
Active
Filter +/-
Needs Funding Source:
Select All
AIP
M&O AIP
M&O Operating
Stimulus
Local
Bond
N/A
Status:
All (Excludes Closed)
Need Created
In Project
Closed
Need Category:
Select One
APRON
BUILDING
EQUIPMENT
FENCING
GROUND TRANSPORTATION
HELIPAD
LEASING
NEW AIRPORT
OTHER
PLANNING
RUNWAY
SEAPLANE BASE
TAXIWAY
M&O Activity:
Select All
Aircraft Rescue & Firefighting Equipment
Buildings
Crack Sealing
Drainage Maintenance & Repair
Dust Control
Embankment Stabilization
Erosion Control
Fence and Gate Repair/Replacement/Installation
Flexible Threshold Markers
Lighting Repair/Replacement
Minor Gravel Resurfacing
Minor Pavement Repair
Obstruction Removal
Pavement Markings
Replacement of Visual Aids
Runway Grading
Safety Areas
Snow Removal Equipment
Stability Control
Vegetation Control
ASAP Needs Total:
Short Term Needs Total:
Mid Term Needs Total:
Long Term Needs Total:
All Needs Total:
Needs in Project Total:
Number of Needs:
Number of Needs in Project:
Needs
Priority
Need Origination
Funding Source
Status
Estimated Cost
Last Edit Date
Acquire Loader
Mid
M&O
AIP
In Project
$431,250
2/3/2023
Crack Seal Runway, Apron & Taxiway
ASAP
Inspection
M&O Operating
In Project
$109,272
4/21/2021
Pavement Marking Repairs
Short
M&O
State GF
In Project
$131,127
4/21/2021
Point Hope Airport Runway Realignment
Mid
Other
AIP
In Project
$14,314,723
2/17/2021
Realign Runway - Stage 2
Mid
Sponsor
AIP
In Project
$8,858,000
2/17/2021
Install Continuously Operating Reference Stations (CORS)
Short
Sponsor
Stimulus
Need Created
$75,000
3/24/2022
Construct Passenger Shelter
Long
Community
N/A
Need Created
7/5/2022
Construct Toilet Facilities
Long
Community
N/A
Need Created
7/5/2022
Total