Need Overview

Need Name: Master plan update
Type:
Funding Source:
Category:
Sub Category:
Estimated Cost: $819,545
Description: The scope will include public involvement, environmental considerations, existing conditions, aviation forecasts, facility requirements, alternatives development and evaluation, an ALP, facilities implementation plan, financial feasibility analysis, intermodal connections, aircraft capacity, and a noise analysis.
Priority: Short
Need Origination: Sponsor
Justification: Bethel is a hub airport for 26 spoke airports that are off the road system; the 2016 AMP needs to be reviewed on a more frequent basis to make sure the plan is still the most efficient plan for the airport and its users. Boeing 737-800 aircraft have been flying into BET for about two years. The 2016 AMP did not forecast this larger aircraft nor did it include intermodal connections and a noise analysis; however, a noise analysis was identified as being “likely required”.
Notes: AIP Handbook (Order 5100.38D, Change 1) Policies: Help identify development necessary to support the new critical aircraft (a)(4); update intermodal connections available near the airport (b)(5), (b)(6), and (g)(1); develop a noise analysis of the surrounding neighborhoods (c)
Last Edit Date: 5/5/2021 12:44 PM
History Log
Jessica Wuttke-Campoamor
In Project
5/4/2021 04:06 PM
Jessica Wuttke-Campoamor
Need Created
5/4/2021 04:18 PM
Removed from project.
Jessica Wuttke-Campoamor
In Project
5/4/2021 04:19 PM
Jessica Wuttke-Campoamor
Need Created
5/5/2021 09:14 AM
Removed from project.
Jessica Wuttke-Campoamor
In Project
5/5/2021 12:41 PM
Jessica Wuttke-Campoamor
Need Created
5/5/2021 12:43 PM
Removed from project.
Jessica Wuttke-Campoamor
In Project
5/5/2021 12:45 PM