Need Overview
Need Name:
Master plan update
Type:
AIP/M&O AIP
Community/Economic Development
Funding Source:
Select One
State GF
AIP
M&O AIP
M&O Operating
Stimulus
Local
Bond
N/A
Category:
Select One
APRON
BUILDING
EQUIPMENT
FENCING
GROUND TRANSPORTATION
HELIPAD
LEASING
NEW AIRPORT
OTHER
PLANNING
RUNWAY
SEAPLANE BASE
TAXIWAY
Sub Category:
Select One
Acquire Easement For Approaches
Acquire Easement for Development
Acquire Easement for Noise Compatibility
Acquire Land For Approaches
Acquire Land for Development
Acquire Land for Noise Compatibility
Acquire Miscellaneous Land
Conduct Aeronautical Survey
Conduct Aeronautical Survey for WAAS Approach
Conduct Airport Master Plan Study
Conduct ALP Update
Conduct Environmental Study
Conduct Ground Transportation Study
Conduct Metropolitan System Plan Study
Conduct Miscellaneous Study
Conduct Noise Compatibility Plan Study
Conduct State System Plan Study
Conduct Vertiport Plan
Construct New ALP
Environmental Action
Identify the Airport's Environmental Footprint
Noise Mitigation Measures
Noise Mitigation Measures for Public Buildings
Noise Mitigation Measures for Residences
Obstruction Survey
Obtain Wind Data
Prepare SMS Manual and Implementation Plan
Resolve Right of Way Issues
Update Airport Master Plan Study
Update Metropolitan System Plan Study
Update Miscellaneous Study
Update State System Plan Study
Wildlife Control
Wildlife Hazard Assessments
Estimated Cost:
$819,545
Description:
The scope will include public involvement, environmental considerations, existing conditions, aviation forecasts, facility requirements, alternatives development and evaluation, an ALP, facilities implementation plan, financial feasibility analysis, intermodal connections, aircraft capacity, and a noise analysis.
Priority:
Short
Need Origination:
Sponsor
Select One
5010
ALP/Master Plan
Community
FAA Initiatives
Inspection
Letter of Compliance
M&O
Other
Sponsor
State Equipment Fleet (SEF)
Justification:
Bethel is a hub airport for 26 spoke airports that are off the road system; the 2016 AMP needs to be reviewed on a more frequent basis to make sure the plan is still the most efficient plan for the airport and its users. Boeing 737-800 aircraft have been flying into BET for about two years. The 2016 AMP did not forecast this larger aircraft nor did it include intermodal connections and a noise analysis; however, a noise analysis was identified as being “likely required”.
Notes:
AIP Handbook (Order 5100.38D, Change 1) Policies: Help identify development necessary to support the new critical aircraft (a)(4); update intermodal connections available near the airport (b)(5), (b)(6), and (g)(1); develop a noise analysis of the surrounding neighborhoods (c)
Last Edit Date:
5/5/2021 12:44 PM
History Log
Jessica Wuttke-Campoamor
In Project
5/4/2021 04:06 PM
Jessica Wuttke-Campoamor
Need Created
5/4/2021 04:18 PM
Removed from project.
Jessica Wuttke-Campoamor
In Project
5/4/2021 04:19 PM
Jessica Wuttke-Campoamor
Need Created
5/5/2021 09:14 AM
Removed from project.
Jessica Wuttke-Campoamor
In Project
5/5/2021 12:41 PM
Jessica Wuttke-Campoamor
Need Created
5/5/2021 12:43 PM
Removed from project.
Jessica Wuttke-Campoamor
In Project
5/5/2021 12:45 PM