Return to Alaska ASP
Alaska Department of Transportation and Public Facilities
ALASKA AVIATION DATABASE
a component of the
Alaska Aviation System Plan
Facilities
Reports
Dashboard
>
Facilities
General
Runways/Helipads
PCI/Surface Condition
Buildings/Equipment
Services/Navcom
Statistics
CIMP Inspection
Needs
Documents/Links
Facility Photos
Performance Measures
PFAS
AIP Grants
NOTAMs
Contacts
BETHEL
:
Documents/Links
This section contains useful links related to this airport as well as a link to the current Airport Layout Plan (ALP) file.
Name
Location
Clicks
Imagery Website
http://www.commerce.state.ak.us/dca/profiles/profile%E2%80%90maps.htm
6
Current ALP
http://dot.alaska.gov/stwdav/documents/ALP/Bethel_ALP.pdf
16
This area contains documents that are not generated by DOT&PF and automatically loaded into the eDocs database. This includes documents produced by local sponsor airports, consultants, cities, boroughs, and other agencies. To add a relevant airport document, go to the bottom of the page.
Name
Date Issued
Downloads
APEB 2018-06-15 BET Main Runway Reconstruction
20
APEB 2018-06-15 BET Parallel Runway Repairs
9
Bethel_Main_Runway_Reconstruction_6-20-2018.pdf
10
Bethel_Main_Runway_Reconstruction_6-20-2018.pdf
7
Taxiway_Apron_and_Fencing_Improvements_4-13-2021.pdf
17
Bethel_Taxiway_Apron_and_Fencing_Improvements_10-13-2022.pdf
5
This section depicts airport information that exists in the DOT&PF eDocs database and shares all files containing an airport Location ID (LOC). To update titles, dates, duplications and or type of document, please access eDocs through the
DOT&PF Employee Intranet page
. To add new documents into eDocs from this page, fill out all required information at the bottom.
Title
Date Issued
Category
Sub Category
Bethel (BET) Airport Master Plan Environmental Assessment (2003)
Planning
Master Plan/EA
Bethel (BET) Airport Layout Plan_1991_01_16
Planning
ALP
6-02-0029-05 Bethel Airport Improvements As-Builts (1978)
12/19/1978
Construction
As Builts
Bethel (BET) Airport Master Plan Update Condition and Needs Assessment (2012)
2/1/2012
Planning
Master Plan
Bethel (BET) Airport Layout Plan_2003_04_30
Planning
ALP
Bethel Airport PCI Inspection (2020)
Planning
Pavement Condition Report
Bethel (BET) AMP Update - Full (2016)
9/1/2016
Planning
Master Plan
Bethel (BET) Airport Layout Plan_1987_08_25
Planning
ALP
56625 Bethel Airport Improvements Phase III As-Builts
Construction
As Builts
51741 Bethel Runway Lighting As-Built
Construction
As Builts
8-02-0029-02 Bethel Airport Development Stage VII As-Builts (1973)
11/9/1973
Construction
As Builts
Bethel (BET) Airport Master Plan (2002)
Planning
Master Plan
Bethel (BET) Airport Layout Plan_1987_08_31
Planning
ALP
56302 Bethel Miscellaneous Improvements As-Builts
Construction
As Builts
8-02-0029-03 Bethel BET Airport Taxiway and Apron Paving (1974)
6/27/1973
Construction
As Builts
Bethel (BET) Airport Layout Plan_1992_05_01
Planning
ALP
D03151 Bethel Airport Miscellaneous Paving Improvements As-Builts (1982)
Construction
As Builts
Bethel Airport PCI Inspection (2017)
Planning
Pavement Condition Report
54195 Bethel BET Hvy Apron Exp and Recon As-Built
Construction
As Builts
57022 Bethel BET Airport Paving Improvements Rnwy 18-36 and Apron
Construction
As Builts
55617 Bethel Airport Improvements Phase 3 Stage 2 As-Builts
Construction
As Builts
Bethel (BET) Airport Master Plan Draft Land Use Assessment (2021)
10/1/2012
Planning
Master Plan
60043 Bethel Runway Stabilization and Taxiway G As-Builts
Construction
As Builts
Bethel (BET) Airport Layout Plan_1987_03_31
Planning
ALP
Bethel Borrow Reconnaissance
Geotechnical
00429 BET Bethel airport Parallel RW Construction Plans As-Builts 1_24_24
1/24/2024
Construction
As Builts
55694 Bethel BET Apt Improv Stg I and II 2007
Construction
As Builts
58805 Bethel Apron Improvements As-Builts (2006)
4/19/2010
Construction
As Builts
59651 Bethel Alaska State Troopers Parking Lot Construction Plans
Construction
As Builts
00429 BET Parallel RW Construction Plans As-Builts
3/6/2023
Construction
As Builts
52787 Bethel Taxiway C Extension As-Builts
Construction
As Builts
Bethel (BET) Airport Layout Plan_2014_02_05
Planning
ALP
Bethel (BET) Airport Layout Plan_2011_12_22
Planning
ALP
Bethel (BET) Airport Layout Plan_2017_04_04
Planning
ALP
Bethel (BET) Airport Layout Plan_2019_08_15
Planning
ALP
D03151 Bethel Taxiway, Apron and Parking Lot Paving As-Builts (1982)
Construction
As Builts
D03182 Bethel Misc Paving Improvements As-Builts (1984)
Construction
As Builts
Bethel (BET) Airport Layout Plan_2010_02_23
Planning
ALP
81-031-01 Bethel BET Airport Safety Fencing (1982)
Construction
As Builts
6-02-0029-07 Bethel Airport Miscellaneous Improvements As-Builts (1987)
4/28/1987
Construction
As Builts
Bethel (BET) Airport Layout Plan_2023_12_21
12/21/2023
Planning
ALP
Bethel (BET) Airport Layout Plan_1992_03_11
Planning
ALP
52810 Bethel Pavement Rehab As-Builts
Construction
As Builts
Bethel Airport Stage V Runway Improvements 1972 As-Builts
Construction
As Builts
52888 Bethel Runway 36 Resurfacing As-Builts
Construction
As Builts
Bethel Airport PCI Inspection (2009)
Planning
Pavement Condition Report
Bethel Airport PCI Inspection (2012)
Planning
Pavement Condition Report
Bethel (BET) Airport Layout Plan_1983_11_04
Planning
ALP
8-02-0029-03 Bethel Taxiway Apron Paving and Improvements As-Builts (1971)
1/18/1971
Construction
As Builts
58445 Bethel Taxiway Signing As-Builts (1990)
4/27/1990
Construction
As Builts
58971 BET Bethel Airport As-built (2017)
7/31/2017
Construction
As Builts
Bethel Airport PCI Inspection (2006)
Planning
Pavement Condition Report
Bethel (BET) Airport Layout Plan_2005_07_13
Planning
ALP
Bethel Airport PCI Inspection (2003)
Planning
Pavement Condition Report
51907 Bethel Apron Rehabilitation As-Builts (2015)
Construction
As Builts
52785 Bethel Air Taxi Apron Expansion As-Builts
Construction
As Builts