Alaska Department of Transportation and Public Facilities
ALASKA AVIATION DATABASE
a component of the
Alaska Aviation System Plan

MERRILL FLD: AIP Grants

Base Information
Owner: MUNICIPALITY OF ANCHORAGE
NPIAS: 02-0015
Airport Use: Public
Type: Airport
FAA Associated City: ANCHORAGE
DOT&PF Region: ---
DOT Owned: False
Facility Status: Active
Filter +/-
Federal Fiscal Year (FFY):
Purpose:    
Purpose Definition
CA Capacity
EN Environment
OT Other
PL Planning
RC Reconstruction
RE Rehabilitate
SA Safety/Security
SB State Block Grant Program
SE Security Enhancements
SP Statutory Emphasis Programs
ST Standards
Component:    
Component Definition
RW Runway Projects
TW Taxiway Projects
AP Apron Projects
TE Terminal Projects
BD Building Projects (other than terminals)
GT Ground Transportation Projects
EQ Equipment, Security, and Fencing
OT Other Projects
LA Land Acquisition (other than noise land)
NA New Airport Projects
PL Planning Projects
SB Seaplane Base Projects
HE Heliport/Helipad Projects
VT Vertiport Projects
HO Noise Projects (other than planning)
PB Noise Mitigation Measures for Public Buildings
Type:    
Type Definition
60 Noise Mitigation Measures for Residences outside 65 DNL
65 Noise Mitigation Measures for Residences within 65 - 69 DNL
70 Noise Mitigation Measures for Residences within 70 - 74 DNL
75 Noise Mitigation Measures for Residences within 75 DNL
AC Access
AQ Acquire Existing Airport
CO Construct
DI Deicing
DV Development
ES Environment Sustainable
EX Extend
FF Fuel Farm
FR Groove Runway
IM Improve
Type Definition
IN Install Instruments
LI Lighting
MA Master Planning
ME Metropolitan System Plan
MS Miscellaneous
MT Environmental Mitigation
NO Noise
OB Obstructions
PA Parking
PM People Mover
PR On-Airport Energy Production
RF Rescue & Fire Fighting
RL Rail
SE Security Enhancements
Type Definition
SF Safety Area
SG Guidance Signs
SN Snow Removal
SR Sensors
ST State System Plan
SV Service Road
SZ Acquire land/easement for approaches
VI Vertical/Visual Guidance System
VT Conduct Vertiport Plan
WH Wildlife Hazard Assessments
WR Construct Wash Rack
WX Install Weather Reporting Equipment
ZE Zero Emissions Vehicle/Infrastructure
Grant Agreement Date:
to
Status:
 
 
Grant Summary Statistics
Total Grants: 81
Total Number of Grant Work Codes: 134 Total Grants: $137,035,241.00
Total Number of Open Grant Work Codes: 18 Total Open Grants: $38,547,363.00
Total Number of Closed Grant Work Codes: 116 Total Closed Grants: $98,487,878.00
 
AIP Grant Listing
The following listing displays all grants since the initiation of the Airport Improvement Program in 1982, most recent to oldest, with the exception of the current federal fiscal year. Grant Agreement Date refers to the date the grant was initiated, Closeout Submitted to FAA notes the date DOT&PF staff submitted a closeout package for review, and Grant Close Date is the official grant closure date, as reported by the FAA. Total cost below includes all AIP funding types (entitlement, discretionary, etc.).
Additional details are exportable into Excel or by going to Reports >> AIP Grants.
FFY    Grant Number    

Each Airport Improvement Program (AIP) grant has a distinct number from the beginning of the program in 1982 to present day. All grants are for the planning and development of public-use airports included in the National Plan of Integrated Airport Systems (NPIAS).

3-02-0000-024-2018 FAA Region (Alaskan)

3-02-0000-024-2018 Airport NPIAS number, assigned to all NPIAS airports starting with 0001 for Adak. 0200 is used for various multi-airport grants (such as pavement marking, various surface maintenance, etc.) and 0000 is used for State System Grants such as the statewide system planning grant.

3-02-0000-024-2018 Grant Sequence Number (this is the 24th grant at this facility)

3-02-0000-024-2018 Federal Fiscal Year Grant Awarded

Work Code    

FAA defines project work codes as a 6-character alpha identifier consisting of three 2-character elements that express purpose, component and type, represents specific airport development and is used in the national priority system equation to produce a numerical rating. Each 2-character alpha identifier may be assigned a value ranging from 0 to 10.

(1) The purpose (P) identifier signifies the underlying objective of an airport development project (e.g., reconstruct, planning, safety). There are approximately 13 purpose identifiers.

(2) The component (C) identifier signifies the physical component (e.g., runway, airfield, planning), for which the development is intended. There are approximately 31 component identifiers.

(3) The type (T) identifier signifies the actual work being done (e.g., expand/extend, construct, update). There are approximately 61 type identifiers.

More information is available in the FAA Order 5090.5, Formulation of the NPIAS and ACIP.

Project DescriptionGrant Agreement DateCloseout Submitted to FAAGrant Close DateTotal
2023 3-02-0015-087-2023 CV LS DV CARES Landside Project $8,996,833
2022 3-02-0015-085-2022 CV RG GN General ARPA 1/11/2022 $1,130,634
2022 3-02-0015-086-2022 ST TW LI Install Taxiway Lighting 6/17/2022 $39,484
2022 3-02-0015-086-2022 ST RW LI Install Runway Lighting 6/17/2022 $78,967
2022 3-02-0015-086-2022 RE AP IM Rehabilitate Apron 6/17/2022 $76,721
2022 3-02-0015-086-2022 RE RW IM Rehabilitate Runway 6/17/2022 $546,917
2022 3-02-0015-086-2022 RE TW IM Rehabilitate Taxiway 6/17/2022 $203,214
2021 3-02-0015-082-2021 ST EQ SN Acquire Snow Removal Equipment 6/22/2021 $700,000
2021 3-02-0015-083-2021 CV CR GN CRRSA Act Funds 3/15/2021 $1,009,042
2020 3-02-0015-079-2020 RC GT AC Reconstruct Access Road 9/8/2020 $8,700,000
2020 3-02-0015-080-2020 CV CA RE CARES Act Funds 5/11/2020 $0
2019 3-02-0015-074-2019 PL PL MS Conduct Miscellaneous Study Conduct planning study to determine best alternative to address RIM point MRI-26 9/10/2019 $287,767
2019 3-02-0015-078-2019 RC GT AC Reconstruct Access Road Reconstruct access road - Phase 1 Design 9/24/2019 $720,000
2019 3-02-0015-071-2019 ST TW LI Install Taxiway Lighting Replace full length TW lighting along TW-C to match lighting upgrades at intersection of TWs C, K, and M. (Accomplished as part of RIM program). 9/24/2019 $1,125,000
2018 3-02-0015-073-2018 RC AP IM Reconstruct Apron Dynamically compact landfill, reconstruct apron. 7/27/2018 $10,851,564
2018 3-02-0015-077-2018 RC TW IM Reconstruct Taxiway Dynamically compact fill under TW- G and regrade/replace pavement 7/27/2018 $1,486,220
2017 3-02-0015-069-2017 RE AP IM Rehabilitate Apron Rehab GA apron adjacent to TW-Q -- 27,500 Square yards 7/24/2017 1/13/2020 $5,100,000
2017 3-02-0015-069-2017 RE TW IM Rehabilitate Taxiway Rehabilitate Taxiway Quebec - Phase 6 7/24/2017 1/13/2020 $1,930,000
2017 3-02-0015-070-2017 ST LA SZ Acquire Land For Approaches Acquire property to control RPZ and facilitate future removal of obstructions from approach surfaces. 9/20/2017 9/20/2017 $346,875
2017 3-02-0015-068-2017 SA EQ RF Acquire Safety and/or Security Equipment Fencing, Signage, Lighting (VPD Reduction) Phase 4 7/11/2017 1/8/2021 $3,445,777
2016 3-02-0015-066-2016 RE TW IM Rehabilitate Taxiway Rehabilitate Taxiway Quebec - Phase 5 6/14/2016 11/7/2019 $1,500,000
2016 3-02-0015-066-2016 RE AP IM Rehabilitate Apron Rehab GA apron adjacent to TW-Q -- 34100 square yards 6/14/2016 11/7/2019 $6,000,000
2016 3-02-0015-067-2016 SA RW LI Install Runway Lighting 05/23 Install Medium Intensity Runway Lights (MIRL) on RW 5/23 7/20/2016 12/4/2019 $656,250
2015 3-02-0015-063-2015 SA EQ RF Acquire Safety and/or Security Equipment Fencing, Signage, Lighting (VPD reduction) Phase 3 8/5/2015 5/30/2019 $4,535,017
2015 3-02-0015-064-2015 ST TW CO Construct Taxiway Phase D (Land Acquis.-City Electr) 9/15/2015 $1,995,000
2014 3-02-0015-061-2014 PL PL MA Update Airport Master Plan Study Phase 2 9/19/2014 $600,000
2014 3-02-0015-062-2014 RE TW IM Rehabilitate Taxiway Rehabilitate Taxiway Quebec - Phase 4 9/18/2014 7/3/2019 $1,145,039
2013 3-02-0015-060-2013 RE RW LI Rehabilitate Runway Lighting 16/34 8/27/2013 1/18/2019 $1,000,403
2013 3-02-0015-059-2013 ST EQ SN Acquire Snow Removal Equipment 8/8/2013 1/18/2019 $866,752
2012 3-02-0015-058-2012 SA EQ RF Acquire Safety and/or Security Equipment Fencing, Signage, Lighting (VPD reduction) Phase 2 8/27/2012 12/22/2017 $1,562,778
2012 3-02-0015-057-2012 RE TW IM Rehabilitate Taxiway Rehabilitate Taxiway Quebec - Phase 3 5/17/2012 1/10/2018 $2,389,772
2011 3-02-0015-055-2011 RE TW IM Rehabilitate Taxiway Rehabilitate Taxiway Quebec - Phase 2 6/8/2011 12/12/2017 $2,239,702
2011 3-02-0015-056-2011 SA EQ RF Acquire Safety and/or Security Equipment Fencing, Signage, Lighting (VPD reduction) 9/9/2011 12/22/2017 $604,537
2011 3-02-0015-053-2011 ST EQ SN Acquire Snow Removal Equipment Acquire SRE - Replace Sweeper/Vacuum Truck 9/27/2011 12/22/2017 $284,215
2011 3-02-0015-054-2011 PL PL MA Conduct Airport Master Plan Study Conduct Airport Master Plan Phase I 8/26/2011 12/22/2017 $551,214
2010 3-02-0015-049-2010 ST EQ SN Acquire Snow Removal Equipment Acquire SRE (part C) 6/7/2010 7/3/2013 $653,600
2010 3-02-0015-051-2010 ST LA SZ Acquire Land For Approaches Acquire Land 7/16/2010 11/5/2014 $298,551
2010 3-02-0015-050-2010 RE RW IM Rehabilitate Runway 16/34 Rehab. runway 3/15/2010 8/22/2013 $3,135,564
2010 3-02-0015-052-2010 ST OT OB Remove Obstructions Remove structure and obstructions 8/31/2010 11/5/2014 $109,751
2010 3-02-0015-050-2010 ST RW VI Install Runway Vertical/Visual Guidance System 16/34 Replace Rwy 34 non-fed PLASI with non-fed PAPI 3/15/2010 8/22/2013 $250,000
2009 3-02-0015-047-2009 SP OT SG Install Runways Incursion Caution Bars Runway VPD barrier gate and warning lights upgrades, phase 2 5/1/2009 3/26/2012 $250,000
2009 3-02-0015-046-2009 RE AP IM Rehabilitate Apron Apron Rehabilitation (ARRA funded) 5/1/2009 1/18/2011 $0
2009 3-02-0015-047-2009 RE AP IM Rehabilitate Apron Block 5 (phase 4) 5/1/2009 3/26/2012 $1,794,066
2009 3-02-0015-048-2009 RE TW IM Rehabilitate Taxiway Rehabilitate Taxiway Quebec - Phase 1 (ARRA funded) 8/18/2009 3/29/2011 $0
2008 3-02-0015-044-2008 RE AP IM Rehabilitate Apron Block 5 (phase 3), Charlie South 6/12/2008 6/4/2012 $2,575,567
2008 3-02-0015-045-2008 SP OT SG Install Runways Incursion Caution Bars Runway VPD barrier gate and warning light upgrades, phase 1 9/8/2008 3/7/2013 $244,129
2007 3-02-0015-042-2007 RE AP IM Rehabilitate Apron Phase 2 (block 5) 5/22/2007 6/13/2011 $2,036,000
2007 3-02-0015-042-2007 ST EQ MS Acquire Equipment (Public Address System) 5/22/2007 6/13/2011 $264,696
2007 3-02-0015-043-2007 ST TW CO Construct Taxiway Phase 1 (Land Acquis.) 6/28/2007 6/3/2010 $1,528,788
2006 3-02-0015-040-2006 ST EQ SN Acquire Snow Removal Equipment 8/4/2006 5/6/2010 $525,464
2006 3-02-0015-041-2006 ST EQ SE Security Enhancements (RSAT Recommendations, Phase 2) 8/21/2006 6/16/2008 $786,631
2006 3-02-0015-041-2006 RE AP IM Rehabilitate Apron Phase 1 (block 5) 8/21/2006 6/16/2008 $927,100
2005 3-02-0015-036-2005 ST EQ SE Security Enhancements (RSAT Recommendations) 5/24/2005 7/1/2008 $1,155,163
2005 3-02-0015-036-2005 RE RW IM Rehabilitate Runway 06/24 5/24/2005 7/1/2008 $2,092,500
2005 3-02-0015-036-2005 ST TW IM Extend Taxiway (RSAT Recommendation) 5/24/2005 7/1/2008 $1,060,000
2004 3-02-0015-039-2004 ST AP IM Expand Apron 7/23/2004 3/12/2007 $1,179,029
2004 3-02-0015-039-2004 SA EQ SE Security Enhancements 7/23/2004 3/12/2007 $1,042,500
2003 3-02-0015-038-2003 RE TW IM Rehabilitate Taxiway 8/7/2003 1/12/2007 $1,208,834
2003 3-02-0015-037-2003 SP OT SG Install Airfield Guidance Signs (RSAT recommendations) 8/21/2003 7/27/2007 $563,358
2002 3-02-0015-035-2002 RE TW IM Rehabilitate Taxiway C 8/13/2002 6/24/2005 $578,000
2002 3-02-0015-035-2002 ST EQ SE Security Enhancements 8/13/2002 6/24/2005 $793,000
2002 3-02-0015-035-2002 RE AP IM Rehabilitate Apron 8/13/2002 6/24/2005 $159,514
2001 3-02-0015-033-2001 ST EQ SE Install Perimeter Fencing 8/17/2001 5/3/2004 $89,227
2001 3-02-0015-032-2001 OT GT AC Improve Access Road 8/17/2001 5/3/2004 $1,517,199
2001 3-02-0015-034-2001 ST RW CO Construct Runway 9/13/2001 2/24/2005 $1,424,640
2000 3-02-0015-030-2000 ST TW CO Construct Taxiway 7/31/2000 8/26/2004 $847,500
2000 3-02-0015-029-2000 ST EQ SN Acquire Snow Removal Equipment 6/20/2000 8/31/2001 $152,362
2000 3-02-0015-030-2000 ST EQ SE Install Perimeter Fencing 7/31/2000 8/26/2004 $683,089
2000 3-02-0015-031-2000 ST EQ SE Install Perimeter Fencing 9/8/2000 4/30/2004 $456,566
1999 3-02-0015-027-1999 ST EQ SE Install Perimeter Fencing 3/25/1999 9/8/2003 $300,000
1999 3-02-0015-027-1999 RE TW IM Rehabilitate Taxiway 3/25/1999 9/8/2003 $797,387
1999 3-02-0015-028-1999 ST RW CO Construct Runway 3/25/1999 9/27/2002 $333,493
1998 3-02-0015-025-1998 ST TW CO Construct Taxiway 3/24/1998 9/27/2002 $478,125
1998 3-02-0015-026-1998 ST EQ SN Acquire Snow Removal Equipment 6/26/1998 9/5/2001 $234,375
1998 3-02-0015-025-1998 SA RW SF Improve Runway Safety Area 6/24 3/24/1998 9/27/2002 $353,364
1998 3-02-0015-025-1998 RE RW LI Rehabilitate Runway Lighting 6/24 3/24/1998 9/27/2002 $600,000
1998 3-02-0015-025-1998 SP OT IN Install Miscellaneous NAVAIDS 3/24/1998 9/27/2002 $150,000
1998 3-02-0015-026-1998 ST EQ SE Install Perimeter Fencing 6/26/1998 9/5/2001 $299,306
1997 3-02-0015-023-1997 OT GT AC Improve Access Road 9/22/1997 9/21/2001 $57,079
1997 3-02-0015-023-1997 ST AP LI Install Apron Lighting 9/22/1997 9/21/2001 $28,417
1997 3-02-0015-023-1997 ST RW VI Install Runway Vertical/Visual Guidance System 9/22/1997 9/21/2001 $13,125
1997 3-02-0015-023-1997 RE TW IM Rehabilitate Taxiway 9/22/1997 9/21/2001 $50,729
1997 3-02-0015-023-1997 RE RW LI Rehabilitate Runway Lighting 6/24 9/22/1997 9/21/2001 $98,190
1997 3-02-0015-024-1997 ST LA DV Acquire Land for Development 9/22/1997 9/21/2000 $204,870
1997 3-02-0015-022-1997 ST EQ SN Acquire Snow Removal Equipment 6/6/1997 1/25/2000 $434,650
1997 3-02-0015-023-1997 ST TW CO Construct Taxiway 9/22/1997 9/21/2001 $64,242
1997 3-02-0015-023-1997 ST RW SF Improve Runway Safety Area 24 9/22/1997 9/21/2001 $62,366
1996 3-02-0015-018-1996 OT GT AC Improve Access Road 9/19/1996 7/24/2000 $125,000
1996 3-02-0015-020-1996 PL PL MA Conduct Airport Master Plan Study 9/19/1996 9/21/2000 $448,907
1996 3-02-0015-019-1996 ST EQ SN Acquire Snow Removal Equipment 9/19/1996 1/25/2000 $374,041
1996 3-02-0015-021-1996 ST LA DV Acquire Land for Development 9/19/1996 6/8/2000 $166,712
1996 3-02-0015-018-1996 RE TW IM Rehabilitate Taxiway 9/19/1996 7/24/2000 $1,050,131
1996 3-02-0015-018-1996 RE AP IM Rehabilitate Apron 9/19/1996 7/24/2000 $1,325,000
1995 3-02-0015-017-1995 ST OT OB Remove Obstructions 8/1/1995 7/14/1999 $500,625
1995 3-02-0015-017-1995 ST EQ SN Acquire Snow Removal Equipment 8/1/1995 7/14/1999 $187,500
1995 3-02-0015-017-1995 SA EQ SE Acquire Security Equipment 8/1/1995 7/14/1999 $126,250
1995 3-02-0015-017-1995 SA OT SG Install Airfield Guidance Signs 8/1/1995 7/14/1999 $171,065
1994 3-02-0015-016-1994 ST LA SZ Acquire Land For Approaches 6/17/1994 12/28/1994 $1,840,808
1993 3-02-0015-015-1993 ST OT OB Remove Obstructions 2/17/1993 10/24/1998 $281,250
1993 3-02-0015-015-1993 ST AP LI Install Apron Lighting 2/17/1993 10/24/1998 $27,163
1992 3-02-0015-014-1992 ST LA SZ Acquire Land For Approaches 8/7/1992 8/13/1992 $863,273
1991 3-02-0015-013-1991 SA EQ SE Acquire Security Equipment 9/11/1991 9/28/1993 $340,963
1991 3-02-0015-013-1991 ST AP CO Construct Apron 9/11/1991 9/28/1993 $773,272
1991 3-02-0015-013-1991 RE AP IM Rehabilitate Apron 9/11/1991 9/28/1993 $455,963
1990 3-02-0015-012-1990 ST LA DV Acquire Land for Development 9/21/1990 12/17/1991 $70,312
1989 3-02-0015-011-1989 ST LA DV Acquire Land for Development 9/13/1989 12/16/1992 $171,281
1989 3-02-0015-011-1989 ST LA MS Acquire Miscellaneous Land 9/13/1989 12/16/1992 $152,062
1989 3-02-0015-010-1989 EN PL NO Conduct Noise Compatibility Plan Study 6/7/1989 10/13/1992 $290,625
1989 3-02-0015-011-1989 EN PB 75 Noise Mitigation Measures for Public Buildings within 75 DNL 9/13/1989 12/16/1992 $68,338
1988 3-02-0015-009-1988 ST AP LI Install Apron Lighting 7/20/1988 8/2/1991 $23,000
1988 3-02-0015-009-1988 RE RW IM Rehabilitate Runway 15/33 7/20/1988 8/2/1991 $1,096,055
1988 3-02-0015-009-1988 CA TW CO Construct Taxiway 7/20/1988 8/2/1991 $23,437
1988 3-02-0015-009-1988 CA GT AC Improve Access Road 7/20/1988 8/2/1991 $792,415
1988 3-02-0015-009-1988 CA AP EX Expand Apron 7/20/1988 8/2/1991 $35,437
1988 3-02-0015-009-1988 CA TW EX Extend Taxiway 7/20/1988 8/2/1991 $103,125
1987 3-02-0015-007-1987 ST LA DV Acquire Land for Development 13/31 1/13/1987 2/19/1987 $2,130,133
1987 3-02-0015-008-1987 ST LA DV Acquire Land for Development 9/23/1987 3/6/1990 $3,073,655
1987 3-02-0015-008-1987 ST EQ SN Acquire Snow Removal Equipment 9/23/1987 3/6/1990 $338,572
1986 3-02-0015-006-1986 ST AP IM Expand Apron 6/9/1986 5/12/1988 $189,466
1986 3-02-0015-006-1986 ST AP IM Expand Apron 6/9/1986 5/12/1988 $2,806,331
1986 3-02-0015-006-1986 RE TW LI Rehabilitate Taxiway Lighting 6/9/1986 5/12/1988 $82,199
1985 3-02-0015-005-1985 RE AP IM Rehabilitate Apron 6/24 7/3/1985 5/16/1988 $328,125
1985 3-02-0015-005-1985 RE AP IM Rehabilitate Apron 6/24 7/3/1985 5/16/1988 $1,716,734
1985 3-02-0015-005-1985 SA EQ SE Acquire Security Equipment 6/24 7/3/1985 5/16/1988 $140,625
1985 3-02-0015-005-1985 ST EQ SN Acquire Snow Removal Equipment 7/3/1985 5/16/1988 $84,376
1984 3-02-0015-003-1984 ST AP IM Expand Apron 15/33 9/21/1984 5/5/1988 $722,526
1984 3-02-0015-004-1984 OT GT AC Improve Access Road 9/26/1984 5/10/1988 $567,689
1984 3-02-0015-004-1984 OT GT AC Improve Access Road 9/26/1984 5/10/1988 $473,109
1984 3-02-0015-004-1984 CA GT AC Improve Access Road 9/26/1984 5/10/1988 $989,955
1984 3-02-0015-003-1984 ST AP LI Install Apron Lighting 9/21/1984 5/5/1988 $30,000
1983 3-02-0015-002-1983 ST EQ SN Acquire Snow Removal Equipment 9/28/1983 4/28/1988 $140,625
1983 3-02-0015-002-1983 ST LA DV Acquire Land for Development 9/28/1983 4/28/1988 $2,022,558
1983 3-02-0015-002-1983 ST RW LI Install Runway Lighting 9/28/1983 4/28/1988 $102,807
1982 3-02-0015-001-1982 ST AP IM Expand Apron 9/29/1982 7/9/1986 $1,563,946