Needs | Priority | Need Origination | Funding Source | Status | Estimated Cost | Last Edit Date | Last Verified Date |
Airfield Lighting and Signage
Airfield Lighting and Signage
|
Short
|
Inspection
|
AIP
|
In Project
|
$2,403,999
| 10/5/2022 | |
Brush Clearing
Brush Clearing
|
Short
|
Inspection
|
AIP
|
In Project
|
$113,300
| 10/5/2022 | |
Pavement Markings
Pavement Markings
|
Short
|
Inspection
|
AIP
|
In Project
|
$168,920
| 10/5/2022 | |
Remove Obstructions
Remove Obstructions
|
ASAP
|
M&O
|
AIP
|
In Project
|
$226,763
| 10/5/2022 | |
Repave all surfaces
Repave all surfaces
|
Short
|
Inspection
|
AIP
|
In Project
|
$20,600,000
| 10/5/2022 | |
Replace Airport Beacon
Replace Airport Beacon
|
ASAP
|
M&O
|
AIP
|
In Project
|
$100,000
| 4/25/2022 | |
Replace broom 34933 with 4600 TTB tracking broom
Replace broom 34933 with 4600 TTB tracking broom
|
Short
|
Other
|
AIP
|
In Project
|
$865,200
| 4/22/2021 | |
Gates
Gates
|
Short
|
Inspection
|
AIP
|
Need Created
|
$20,000
| 10/5/2022 | |
Install Continuously Operating Reference Stations (CORS)
Install Continuously Operating Reference Stations (CORS)
|
Short
|
Sponsor
|
Stimulus
|
Need Created
|
$75,000
| 3/24/2022 | |
| | | | |
Total
| | |