BETHEL: Airport Needs List

Filter +/-
Needs Funding Source:
Status:
Need Category:
 
ASAP Needs Total:   Short Term Needs Total:
Mid Term Needs Total: Long Term Needs Total:
All Needs Total: Needs in Project Total:
Number of Needs: Number of Needs in Project:
 
Needs List
NeedsPriorityNeed OriginationFunding SourceStatusEstimated CostLast Edit DateLast Verified Date
Airfield: RC AF SG : Reconstruct Airfield Signage/Markings
Reconstruct Airfield Guidance Signs
Short Inspection AIP Draft Need $500,000 5/26/2026 
Equipment, Security, and Fencing: ST EQ GE : Acquire and Install Electrical Emergency Generator
Acquire Emergency Generator
Short Inspection AIP Draft Need $700,000 5/26/2026 
Bethel Parallel Runway Repairs
Bethel Parallel Runway Repairs
Mid Other AIP In Project $9,548,100 3/12/2019 
Master plan update
Master plan update
Short Sponsor AIP In Project $869,454 5/5/2021 
Air Carrier Apron Resurfacing and Lighting
Air Carrier Apron Resurfacing and Lighting
Mid ALP/Master Plan AIP Need Created $1,634,919 4/29/2022 
Airport Master Planning: PL MA WH : Airport Wildlife Hazard Assessment/Site Visit/Management Plan
Mitigate Wildlife Hazard From Pond
Short ALP/Master Plan AIP Need Created $217,227 7/17/2026 
Apron Projects: CA AP CO : Construct Apron
Air Carrier Apron Roads and Parking Phase 1
Short ALP/Master Plan AIP Need Created $2,300,000 7/17/2026 
Apron Projects: CA AP CO : Construct Apron
Air Carrier Apron Road and Parking Phase 2
Mid ALP/Master Plan AIP Need Created $1,257,630 7/17/2026 
Apron Projects: ST AP EX : Expand Apron
Air Carrier Apron Road and Parking Phase 3
Long ALP/Master Plan AIP Need Created $1,154,733 7/17/2026 
Equipment, Security, and Fencing: RC EQ VU : Reconstruct Airport Lighting Vault Equipment
Replace Airport Lighting Vault
Short Inspection AIP Need Created $1,000,000 5/26/2026 
Equipment, Security, and Fencing: SA EQ RF : Acquire Aircraft Rescue & Fire Fighting Vehicle
Purchase New 3,000 gal. ARFF Truck
Short State Equipment Fleet (SEF) AIP Need Created $815,245 7/14/2026 
Expand Air Carrier and Air Cargo Aprons and Lease Lots
Expand Air Carrier and Air Cargo Aprons and Lease Lots
Long ALP/Master Plan AIP Need Created $10,198,236 4/29/2022 
Fence: ST FE CO : Install Perimeter Fencing
Construct M&O Service Road
Long M&O AIP Need Created $26,987,000 7/17/2026 
Ground Transportation Projects: CA GT AC : Construct Service Road
North Air Taxi Roads & Parking Phase 2
Mid ALP/Master Plan AIP Need Created $4,721,829 7/21/2026 
Install Continuously Operating Reference Stations (CORS)
Install Continuously Operating Reference Stations (CORS)
Short Sponsor Stimulus Need Created $75,000 3/24/2022 
Land Acquisition (other than noise land): ST LA DV : Acquire Land for Development
Property Acquisition and Fencing
Long ALP/Master Plan AIP Need Created $3,000,000 7/17/2026 
M&O Facilities Replacement and Relocation
M&O Facilities Replacement and Relocation
Long ALP/Master Plan AIP Need Created $31,875,204 4/29/2022 
Partial Parallel Taxiway and Extend TW J
Partial Parallel Taxiway and Extend TW J
Short ALP/Master Plan AIP Need Created $3,212,673 4/29/2022 
Replace EEB
Replace EEB
Short Inspection AIP Need Created $1,000,000 12/22/2023 
Resurface RW 1L-19R and HIRL
Resurface RW 1L-19R and HIRL
Long ALP/Master Plan AIP Need Created $7,214,223 4/29/2022 
Runway 1R-19L Resurfacing and MIRL
Runway 1R-19L Resurfacing and MIRL
Long ALP/Master Plan AIP Need Created $3,761,457 4/29/2022 
Runway Projects: SA RW SF : Construct/Extend Safety Area
Level/Reinforce 1L-19R RSA
Short ALP/Master Plan AIP Need Created $5,007,654 7/17/2026 
Taxiway Projects: RE TW IM : Rehabilitate Taxiway
Rehabilitate Taxiway
Short Inspection AIP Need Created $50,000 5/26/2026 
Construct Tie-Downs
Construct Tie-Downs
Long Community N/A Need Created 3/31/2022 
Equipment, Security, and Fencing: ST EQ IN : Install Wind Cone/Segmented Circle
Reconstruct Segmented Circle and Primary Wind Cone
Mid M&O AIP Obligated Need $100,000 7/21/2026 
Equipment, Security, and Fencing: ST EQ SN : Acquire Snow Removal Equipment
Acquire Broom/Blower Combo
Mid M&O AIP Obligated Need $800,000 9/3/2026 
Equipment: ST EQ SN: Acquire Snow Removal Equipment
Acquire Loader
Mid M&O AIP Obligated Need $450,000 9/3/2026 
Purchase AFFF Testing Equipment
Purchase AFFF Testing Equipment
ASAP Other AIP Obligated Need $56,836 3/22/2021 
Runway Projects: RC RW IM : Reconstruct Runway
Reconstruct Runway 1R-19L
Mid Other AIP Obligated Need $23,000,000 7/21/2026 
Runway Projects: RC RW LI : Reconstruct Runway Lighting
Reconstruct Runway 1L-19R Lighting
Mid Other AIP Obligated Need $1,500,000 7/21/2026 
Runway Projects: RS RW IM : Reseal/Resurface Runway Pavement
Crack Seal & Pavement Markings (26-28)
Short M&O AIP Obligated Need $618,000 7/20/2026 
Taxiway Projects: RC TW IM : Reconstruct Taxiway
Reconstruct TWs A, C, D (west of RW), G (west of TW C)
Mid Other AIP Obligated Need $11,000,000 7/21/2026 
Taxiway Projects: RC TW LI : Reconstruct Taxiway Lighting
Reconstruct Taxiway Lighting
Mid Other AIP Obligated Need $1,800,000 7/21/2026 
Taxiway Projects: RE TW IM : Rehabilitate Taxiway
Resurface Taxiway B
Mid Other AIP Obligated Need $663,000 7/21/2026 
Apron Projects: RC AP IM : Reconstruct Apron
Reconstruct ARFF/SREB Apron
Short Inspection AIP Programmed Need $170,000 7/21/2026 
Equipment, Security, and Fencing: EN EQ DI : Deicing Containment Equipment
Acquire Grader
Mid M&O AIP Programmed Need $500,000 8/27/2025 
Equipment, Security, and Fencing: ST EQ SN : Acquire Snow Removal Equipment
Acquire Grader
Short M&O AIP Programmed Need $500,000 8/27/2025 
Fence: RC FE MS : Reconstruct Perimeter Fencing
Reconstruct Perimeter Fence
Short Inspection AIP Programmed Need $3,278,000 7/14/2026 
Other Projects: EN OT MT : Environmental Mitigation
Conduct PFAS Remediation Pilot Study
Short Sponsor AIP Programmed Need $250,000 7/27/2026 
Reconstruct Apron
Reconstruct Apron
Short Inspection AIP Programmed Need $1,443,000 9/16/2022 
Reconstruct Taxiway
Reconstruct Taxiway
Short Inspection AIP Programmed Need $3,535,000 9/16/2022 
Reconstruct Taxiway Lighting
Reconstruct Taxiway Lighting
Short Inspection AIP Programmed Need $584,000 9/16/2022 
Rehabilitate Apron
Rehabilitate Apron
Short Inspection AIP Programmed Need $4,771,000 9/16/2022 
Service/Perimeter Road: ST SV CO : Construct Service Road
Construct Service Road
ASAP ALP/Master Plan AIP Programmed Need $26,987,000 7/17/2026 
      Total