Return to Alaska ASP
Alaska Department of Transportation and Public Facilities
ALASKA AVIATION DATABASE
a component of the
Alaska Aviation System Plan
Facilities
Reports
Dashboard
>
Facilities
General
Runways/Helipads
PCI/Surface Condition
Buildings/Equipment
Services/Navcom
Statistics
CIMP Inspection
Needs
Documents/Links
Facility Photos
Performance Measures
PFAS
AIP Grants
NOTAMs
Contacts
LAKE HOOD
:
Airport Needs List
Owner:
STATE OF AK - DOT & PF
NPIAS:
02-0015
Airport Use:
Public
Type:
Seaplane Base
FAA Associated City:
ANCHORAGE
DOT&PF Region:
Central
DOT Owned:
True
Facility Status:
Active
Filter +/-
Needs Funding Source:
Select All
AIP
M&O AIP
M&O Operating
Stimulus
Local
Bond
N/A
Status:
All (Excludes Closed)
Need Created
In Project
Closed
Need Category:
Select One
APRON
BUILDING
EQUIPMENT
FENCING
GROUND TRANSPORTATION
HELIPAD
LEASING
NEW AIRPORT
OTHER
PLANNING
RUNWAY
SEAPLANE BASE
TAXIWAY
M&O Activity:
Select All
Aircraft Rescue & Firefighting Equipment
Buildings
Crack Sealing
Drainage Maintenance & Repair
Dust Control
Embankment Stabilization
Erosion Control
Fence and Gate Repair/Replacement/Installation
Flexible Threshold Markers
Lighting Repair/Replacement
Minor Gravel Resurfacing
Minor Pavement Repair
Obstruction Removal
Pavement Markings
Replacement of Visual Aids
Runway Grading
Safety Areas
Snow Removal Equipment
Stability Control
Vegetation Control
ASAP Needs Total:
Short Term Needs Total:
Mid Term Needs Total:
Long Term Needs Total:
All Needs Total:
Needs in Project Total:
Number of Needs:
Number of Needs in Project:
Needs
Priority
Need Origination
Funding Source
Status
Estimated Cost
Last Edit Date
LHD - Rehabilitate Aprons A, B, and E
Short
Other
AIP
In Project
$1,000,000
2/12/2024
LHD - Rehabilitate Taxiway E
Mid
Other
AIP
In Project
$500,000
2/12/2024
Rehabilitate Aircraft and Lakeshore Drive – Drainage
Short
M&O
AIP
In Project
$520,000
2/12/2024
Rehabilitate Aircraft and Lakeshore Drive – Rehabilitation
Short
M&O
AIP
In Project
$2,260,000
2/12/2024
Rehabilitate Aircraft and Lakeshore Drive –Reconstruction
Short
M&O
AIP
In Project
$820,000
2/12/2024
Contact ANC planner for more details
N/A
Other
N/A
Need Created
$0
4/30/2019
Total