Return to Alaska ASP
Alaska Department of Transportation and Public Facilities
ALASKA AVIATION DATABASE
a component of the
Alaska Aviation System Plan
Facilities
Reports
Dashboard
>
Facilities
General
Runways/Helipads
PCI/Surface Condition
Buildings/Equipment
Services/Navcom
Statistics
CIMP Inspection
Needs
Documents/Links
Facility Photos
Performance Measures
PFAS
AIP Grants
NOTAMs
Contacts
Filter +/-
Needs Funding Source:
Select All
AIP
M&O AIP
M&O Operating
Stimulus
Local
Bond
N/A
Status:
All (Excludes Closed)
Need Created
In Project
Closed
Need Category:
Select One
APRON
BUILDING
EQUIPMENT
FENCING
GROUND TRANSPORTATION
HELIPAD
LEASING
NEW AIRPORT
OTHER
PLANNING
RUNWAY
SEAPLANE BASE
TAXIWAY
M&O Activity:
Select All
Aircraft Rescue & Firefighting Equipment
Buildings
Crack Sealing
Drainage Maintenance & Repair
Dust Control
Embankment Stabilization
Erosion Control
Fence and Gate Repair/Replacement/Installation
Flexible Threshold Markers
Lighting Repair/Replacement
Minor Gravel Resurfacing
Minor Pavement Repair
Obstruction Removal
Pavement Markings
Replacement of Visual Aids
Runway Grading
Safety Areas
Snow Removal Equipment
Stability Control
Vegetation Control
ASAP Needs Total:
Short Term Needs Total:
Mid Term Needs Total:
Long Term Needs Total:
All Needs Total:
Needs in Project Total:
Number of Needs:
Number of Needs in Project:
Needs List
Needs
Priority
Need Origination
Funding Source
Status
Estimated Cost
Last Edit Date
Acquire Dozer
Mid
M&O
AIP
In Project
$400,000
3/2/2023
Construct 1,098' Runway Extension
Long
Community
AIP
In Project
$10,128,008
11/23/2015
Construct 1-bay 1 heated SREB
ASAP
Other
AIP
In Project
$1,194,051
8/10/2016
Newtok Airport Relocation - Stage 2
Long
Sponsor
AIP
In Project
$28,737,000
2/17/2021
Construct Passenger Shelter
Long
Community
N/A
Need Created
2/27/2023
Construct Toilet Facilities
Long
Community
N/A
Need Created
2/27/2023
Total