Facilities
Reports
Air Carriers
Links
Dashboard
>
Facilities
General
Runways/Helipads
PCI/Surface Condition
Buildings/Equipment
Services/Navcom
Statistics
CIMP Inspection
Land Occupancy/Leasing
Needs
Documents/Links
Facility Photos
Performance Measures
PFAS
AIP Grants
NOTAMs
OE/AAA
Communities
Contacts
Need Overview
Need Name:
Runway Projects: RE RW IM : Rehabilitate Runway
Common Name:
Painted Markings 2029
Type:
AIP
Community/Economic Development
M&O Operating
Funding Source:
Select One
State GF
AIP
IARF
M&O Operating
Stimulus
PFC
N/A
Component:
Select One
Access Road
Airfield
Airport Master Planning
Apron Projects
Building and Equipment
Building Projects (other than terminals)
Equipment, Security, and Fencing
Fence
Heliport/Helipad Projects
Land Acquisition (other than noise land)
New Airport Projects
Noise Mitigation Measures for Public Buildings
Noise Projects (other than planning)
Other Projects
Revenue Producing
Runway Projects
Seaplane Base Projects
Service/Perimeter Road
State/Regional Planning
Taxilane
Taxiway Projects
Terminal Projects
Work Code:
CC RW EX : Extend Runway
CC RW SF : Extend Runway Safety Area
RC RW IM : Reconstruct Runway
RC RW LI : Reconstruct Runway Lighting
RC RW SF : Reconstruct Engineered Material Arresting System
RE RW IM : Rehabilitate Runway
RE RW LI : Rehabilitate Runway Lighting
RE RW SG : Rehabilitate Runway Markings
RS RW IM : Reseal/Resurface Runway Pavement
SA RW OB : Obstruction Marking/Lighting/Removal (Hazard)
SA RW SF : Construct Engineered Material Arresting System
SA RW SF : Construct/Extend Safety Area
SA RW SG : Install Runway Signage/Markings
SA RW SH : Shift Runway
SA RW VI : Install Runway Visual Guidance System
ST RW CO : Construct Runway
ST RW EX : Extend/Expand Runway
ST RW IM : Realign Runway
ST RW IM : Strengthen Runway
ST RW IN : Install Instrument Approach Aid
ST RW LI : Install Runway Lighting
ST RW OB : Obstruction Marking\Lighting\Removal
ST RW SG : Install Runway Signage/Markings
Location Type:
Select One
General Information
Building
Runway
Taxiway
Apron
Access Road
Equipment
Seaplane Base
Airport Leasing
Location:
N/A
Estimated Cost:
$150,000
Description:
R&R Markings on Runways 15/33 (1,527,000 SF @ 10,180 'X 150’) & 8/26 (735,000 SF @ 4900’ x 150').
Priority:
Mid
Need Origination:
M&O
Select One
5010
ALP/Master Plan
Community
FAA Initiatives
Inspection
Letter of Compliance
M&O
Other
Sponsor
State Equipment Fleet (SEF)
Justification:
Due to the wear associated with snow removal activities markings are required to be repainted on a regular schedule at DOT&PF Primary and Non-Primary airports. FAA Order 5100.38D, Change 1, Table 3-2(a) for Non-Hub Primary & Non-Primary Airports. Stand-Alone Marking Projects are eligible IAW 5100.38D, Change 1, Table J-1 (b).
Notes:
Last Edit Date:
2/10/2026 02:19 PM
History Log
Kari Hebert
Need Created
1/20/2026 09:09 AM
Kari Hebert
In Project
2/10/2026 02:23 PM
Kari Hebert
Programmed Need
2/10/2026 02:26 PM