Need Overview
Need Name:
Install Miscellaneous NAVAIDS
Type:
AIP/M&O AIP
Community/Economic Development
Funding Source:
Select One
State GF
AIP
M&O AIP
M&O Operating
Stimulus
Local
Bond
N/A
Category:
Select One
APRON
BUILDING
EQUIPMENT
FENCING
GROUND TRANSPORTATION
HELIPAD
LEASING
NEW AIRPORT
OTHER
PLANNING
RUNWAY
SEAPLANE BASE
TAXIWAY
Sub Category:
Select One
Acquire Mobile ARFF Training Facility
Construct ARFF Training Facility
Construct Deicing Containment Facility (Environmental)
Construct Deicing Containment Facility (Standards)
Construct Infrastructure to Support WAAS Approach
Construct Parking Lot
Construct Utilities (Airfield)
Construct Utilities (Building)
Environmental Mitigation
Improve Airport Drainage
Improve Airport Erosion Control
Improve Airport Miscellaneous Improvements
Improve Utilities (Airfield)
Improve Utilities (Building)
Install Airfield Guidance Signs
Install Airport Beacons
Install Guidance Signs
Install Miscellaneous NAVAIDS
Install Noise Monitoring System
Install Runways Incursion Caution Bars
Install Signs
Light Obstructions
Mark Obstructions
Rehabilitate Airport Beacons
Rehabilitate Parking Lot
Relocate Landfill
Remove Obstructions (Airfield)
Remove Obstructions (M&O)
Remove Obstructions to Permit WAAS Approach
Remove Signs
Repair Utilities (Airfield)
Repair Utilities (Building)
Runway Incursion Markings
Estimated Cost:
$116,300
Description:
This project will rehabilitate the runway, taxiway, and apron and apply dust palliative. The grade will be raised above the 100-year flood elevation and the runway length will be reduced to meet current FAA standards. The runway and taxiway markers and navigational aids will be repaired or replaced as needed.
Priority:
Short
Need Origination:
M&O
Select One
5010
ALP/Master Plan
Community
FAA Initiatives
Inspection
Letter of Compliance
M&O
Other
Sponsor
State Equipment Fleet (SEF)
Justification:
Heavy maintenance is needed at this airport for safety. The operational surfaces were last improved in 1982. The operational surfaces are in poor and failing condition based on the June 2022 CIMP Inspection Report. There are significant surface variations and settlement cracking the length of the runway. The crown has been graded off and subbase is now exposed. Repairs are failing, surfaces are not compacted, and there are frequent soft spots. The airport is experiencing flooding due to ice dams during the annual breakup season. The fines have been washed out of the crushed aggregate surface course due to the flooding. The runway embankment is subsiding and the southeast runway embankment is beginning to be impacted by the Kuskokwim River. Available materials for repair are insufficient to armor the embankment.
Notes:
CIP Work Code: SP OT IN CIP Datasheet: 1/3/2024
Last Edit Date:
1/16/2024 12:21 PM
History Log
Philana Miles
Need Created
1/16/2024 12:19 PM