Return to Alaska ASP
Alaska Department of Transportation and Public Facilities
ALASKA AVIATION DATABASE
a component of the
Alaska Aviation System Plan
Facilities
Reports
Dashboard
>
Facilities
General
Runways/Helipads
PCI/Surface Condition
Buildings/Equipment
Services/Navcom
Statistics
CIMP Inspection
Needs
Documents/Links
Facility Photos
Performance Measures
PFAS
AIP Grants
NOTAMs
Contacts
Need Overview
Need Name:
Rehabilitate Terminal Access Road
Type:
AIP/M&O AIP
Community/Economic Development
Funding Source:
Select One
State GF
AIP
M&O AIP
M&O Operating
Stimulus
Local
Bond
N/A
Category:
Select One
APRON
BUILDING
EQUIPMENT
FENCING
GROUND TRANSPORTATION
HELIPAD
LEASING
NEW AIRPORT
OTHER
PLANNING
RUNWAY
SEAPLANE BASE
TAXIWAY
Sub Category:
Select One
Construct Access Road
Construct Service Road
Expand Access Road
Expand Service Road
Improve Access Road
Improve Service Road
Modify Access Road
Modify Service Road
Rehabilitate Access Road
Rehabilitate Service Road
Relocate Road
Remove Road
Estimated Cost:
$6,500,000
Description:
This project will rehabilitate the access road around the south end of the airport (Perimeter Rd and Airport Industrial Rd) and construct a sidewalk.
Priority:
Short
Need Origination:
M&O
Select One
5010
ALP/Master Plan
Community
FAA Initiatives
Inspection
Letter of Compliance
M&O
Other
Sponsor
State Equipment Fleet (SEF)
Justification:
These roads are used to connect the east side of the airport to the passenger terminal located on the west side. The pavement has outlived its useful life and needs to be replaced. There are no existing sidewalks to allow pedestrians to safely move between the east and west sides of the airport.
Notes:
Last Edit Date:
11/1/2023 10:27 AM
History Log
RJ Stumpf
Need Created
11/1/2023 10:27 AM
RJ Stumpf
In Project
11/1/2023 10:28 AM