Need Overview
Need Name:
Reconstruct Runway Lighting
Type:
AIP
Community/Economic Development
M&O Operating
Funding Source:
Select One
State GF
AIP
M&O Operating
Stimulus
N/A
Category:
Select One
Access Road
Airfield
Airport Master Planning
Airside
Apron
ARPA
Building
Building and Equipment (Control Tower)
CARES Act
CRRSA Act
Equipment
Financing
Ground Transportation
Helipad/Heliport
Homes
Land
Landside
Metro Area Planning
Multi Modal
New Airport
Noise
Other
People Mover
Planning
Privatization Planning
Public Building
Rail
Revenue Producing
Runway
Sealane
Seaplane Base
Service/Perimeter Road
State Block Grant Program
State/Regional Planning
Taxilane
Taxiway
Terminal
Sub Category:
Select One
Construct Taxiway
Construct Taxiway
Construct Taxiway
Construct Taxiway
Extend Taxiway
Extend Taxiway
Extend Taxiway
Install Taxiway Lighting
Install Taxiway Lighting
Install Taxiway Lighting
Install Taxiway Lighting
Install Taxiway Sensors
Install Taxiway Sensors
Reconstruct Taxiway
Reconstruct Taxiway Lighting
Rehabilitate Taxiway
Rehabilitate Taxiway
Rehabilitate Taxiway Lighting
Rehabilitate Taxiway Lighting
Rehabilitate taxiway signage/markings
Remove Taxiway
Replace Taxiway Marking and Signage
Seal Taxiway Pavement Surface/Pavement Joints
Shift or Reconfigure Existing Taxiway
Strengthen Taxiway
Strengthen Taxiway
Widen Taxiway
Widen Taxiway
Estimated Cost:
$1,514,200
Description:
This project will reconstruct the runway (1-19) lighting.
Priority:
Short
Need Origination:
M&O
Select One
5010
ALP/Master Plan
Community
FAA Initiatives
Inspection
Letter of Compliance
M&O
Other
Sponsor
State Equipment Fleet (SEF)
Justification:
The purpose of the project is to replace the failing and inefficient airport lighting system and navigational aids. Recent electrical testing was performed at Talkeetna Airport, and the results indicate that there are system-wide issues with the lighting system.
Notes:
Last Edit Date:
4/11/2023 02:55 PM
History Log
Rebecca Douglas
Need Created
4/11/2023 02:55 PM
Rebecca Douglas
In Project
4/11/2023 02:59 PM