Need Name:
Rehabilitate Runway
Type:
AIP/M&O AIP
Community/Economic Development
Funding Source:
Select One
State GF
AIP
M&O AIP
M&O Operating
Stimulus
Local
Bond
N/A
Category:
Select One
APRON
BUILDING
EQUIPMENT
FENCING
GROUND TRANSPORTATION
HELIPAD
LEASING
NEW AIRPORT
OTHER
PLANNING
RUNWAY
SEAPLANE BASE
TAXIWAY
Sub Category:
Select One
Apply Runway Friction Course
Construct Runway
Construct Runway Safety Area [Non-Primary Airports]
Construct Runway Safety Area [Primary Airports]
Expand Surfaces
Extend Runway
Extend Runway Safety Area
Groove Runway
Improve Runway Safety Area
Install Instrument Approach Aid
Install Runway Distance-To-Go Signs
Install Runway Lighting
Install Runway Sensors
Install Runway Vertical/Visual Guidance System
Rehabilitate Runway
Rehabilitate Runway Lighting
Relocate Approach Lighting
Relocate NAVAID
Repair NAVAID
Shift Runway
Strengthen Runway
Widen Runway
Estimated Cost:
$11,395,385
Description:
Mill and pave the runway.
Priority:
Short
Need Origination:
Sponsor
Select One
5010
ALP/Master Plan
Community
FAA Initiatives
Inspection
Letter of Compliance
M&O
Other
Sponsor
State Equipment Fleet (SEF)
Justification:
The pavement is 13 years old and the 2023 PCI report will likely show a PCI of 55-69. We don't want to wait until it gets lower than 55 because then we have to reconstruct. There is also the usual 5-year time between APEB and actual construction. The airport receives jet traffic and the pavement will be far beyond it's useful life in the 2028-2030 time period. I needs to have a mill and pave around then.
Notes:
The blast pads need to be repaved as well because they are settling. RE RW IM
Last Edit Date:
2/27/2024 03:44 PM
History Log
Paul Khera
Need Created
4/5/2023 12:01 PM
Paul Khera
In Project
11/14/2023 11:11 AM
Paul Khera
Need Created
2/27/2024 03:17 PM
Removed from project.
Paul Khera
In Project
2/27/2024 03:49 PM