Need Overview
Need Name:
Reconstruct Taxiways
Type:
AIP/M&O AIP
Community/Economic Development
Funding Source:
Select One
State GF
AIP
M&O AIP
M&O Operating
Stimulus
Local
Bond
N/A
Category:
Select One
APRON
BUILDING
EQUIPMENT
FENCING
GROUND TRANSPORTATION
HELIPAD
LEASING
NEW AIRPORT
OTHER
PLANNING
RUNWAY
SEAPLANE BASE
TAXIWAY
Sub Category:
Select One
Construct Taxiway
Demolish Taxiway
Extend Taxiway
Install Taxiway Lighting
Install Taxiway Sensors
Rehabilitate Taxiway
Rehabilitate Taxiway Lighting
Relocate Taxiway
Strengthen Taxiway
Widen Taxiway
Estimated Cost:
$3,000,000
Description:
Reconstruct the general aviation apron and associated taxiways (C, D, and W). Replace taxiway lighting.
Priority:
Short
Need Origination:
ALP/Master Plan
Select One
5010
ALP/Master Plan
Community
FAA Initiatives
Inspection
Letter of Compliance
M&O
Other
Sponsor
State Equipment Fleet (SEF)
Justification:
This project was listed in the implementation plan for the 2014 Master Plan and the 2019 Eastside Mater Plan. The pavement on the east ramp is in poor condition, particularly Taxiways D and uncontrolled C, and requires paving. The majority of the apron is over 25 years old. The 2021 pavement condition inspection recorded PCI values on the apron between 33 and 54. PCI values for Taxiway C ranged between 46 and 64, Taxiway D between 54 and 64 and Taxiway W between 63 and 66, respectively.
Notes:
Last Edit Date:
12/1/2022 04:05 PM
History Log
Jodi Gould
Need Created
12/1/2022 04:05 PM
Jodi Gould
In Project
12/1/2022 04:07 PM