Alaska Department of Transportation and Public Facilities
ALASKA AVIATION DATABASE
a component of the
Alaska Aviation System Plan

Need Overview

Need Name: Terminal Covered Walkway
Type:
Funding Source:
Category:
Sub Category:
Estimated Cost: $33,850,000
Description: This project would provide a cover along the length of the terminal building including a portion of the terminal access road and the first row of handicap parking in the terminal parking lot. The cover would also be extended along the sidewalk to the terminal bus plaza which is the location for ground transportation services. Other improvements include CCTV cameras, lighting, new terminal vestibule doors and carpeting and revised handicap parking stall ramps.
Priority: Short
Need Origination: M&O
Justification: Establishing covered walkways, stairs and ADA accessible ramps will provide pedestrian safety by addressing snow removal that’s limited in any timely response during snow events. This will ensure walkways and crosswalks are clearly delineated for pedestrians accessing the terminal as well as reducing and incidents pertaining to slips and falls. Having these areas covered will help maintain ADA compliance, reduce injuries and labor costs.
Notes:
Last Edit Date: 11/30/2022 04:28 PM
History Log
Jodi Gould
Need Created
11/30/2022 04:28 PM
Jodi Gould
In Project
12/9/2022 02:45 PM
RJ Stumpf
Need Created
10/31/2023 10:52 AM
Removed from project.