Return to Alaska ASP
Alaska Department of Transportation and Public Facilities
ALASKA AVIATION DATABASE
a component of the
Alaska Aviation System Plan
Facilities
Reports
Air Carriers
Links
Dashboard
>
Facilities
General
Runways/Helipads
PCI/Surface Condition
Buildings/Equipment
Services/Navcom
Statistics
CIMP Inspection
Land Occupancy/Leasing
Needs
Documents/Links
Facility Photos
Performance Measures
PFAS
AIP Grants
NOTAMs
Communities
Contacts
Need Overview
Need Name:
Acquire Aircraft Rescue & Fire Fighting Vehicle
Common Name:
Acquire Aircraft Rescue & Fire Fighting Vehicle
Type:
AIP
Community/Economic Development
M&O Operating
AIAS IARF
PFC
Funding Source:
Select One
State GF
AIP
IARF
M&O Operating
Stimulus
PFC
N/A
Component:
Select One
Access Road
Airfield
Airport Master Planning
Apron Projects
Building and Equipment
Building Projects (other than terminals)
Equipment, Security, and Fencing
Fence
Ground Transportation Projects
Heliport/Helipad Projects
Land Acquisition (other than noise land)
New Airport Projects
Noise Mitigation Measures for Public Buildings
Noise Projects (other than planning)
Other Projects
People Mover
Planning Projects
Privatizaton Planning
Revenue Producing
Runway Projects
Seaplane Base Projects
Service/Perimeter Road
State/Regional Planning
Taxilane
Taxiway Projects
Terminal Projects
Vertiport Projects
Work Code:
EN BE MT : Construct Environmental Mitigation Measures
EN EQ DI : Deicing Containment Equipment
EN EQ MS : Energy Efficiency Equipment/Infrastructure
EN EQ MS : VALE GSE Retrofit Pilot Program
EN EQ MT : Environmental Mitigation
EN EQ VL : VALE Infrastructure
EN EQ ZE : Zero Emissions Infrastructure
RC BE VU : Reconstruct Airport Lighting Vault
RC EQ DI : Reconstruct Deicing Containment Equipment
RC EQ FR : Reconstruct Friction Measuring Equipment
RC EQ GE : Reconstruct Electrical Emergency Generator
RC EQ RF : Reconstruct Aircraft Rescue and Fire Fighting Vehicle
RC EQ SN : Reconstruct Snow Removal Equipment
RC EQ VI : Reconstruct Airport Rotating Beacon
RC EQ VU : Reconstruct Airport Lighting Vault Equipment
RC EQ WX : Reconstruct Weather Reporting Equipment
RE EQ DI : Rehabilitate Deicing Containment Equipment
RE EQ RF : Rehabilitate Aircraft Rescue and Fire Fighting Vehicle
RE EQ SN : Rehabilitate Snow Removal Equipment
RE EQ VI : Rehabilitate Airport Rotating Beacon
SA BE TR : Construct/Acquire Aircraft Rescue and Fire Fighting Training Facility
SA EQ AQ : Acquire Aircraft Rescue and Fire Fighting Safety Equipment
SA EQ FR : Acquire Friction Measuring Equipment
SA EQ LI : Acquire Runway Temporary Closure Lighting
SA EQ RF : Acquire Aircraft Rescue & Fire Fighting Vehicle
SA EQ RF : Acquire Aircraft Rescue and Fire Fighting Vehicle
SA EQ RF : Acquire Safety and/or Security Equipment
SA EQ VI : Install Airport Beacon
SA EQ VI : Install Airport Rotating Beacon
SE EQ AQ : Acquire Security Equipment
ST BE VU : Construct Airport Lighting Vault
ST EQ GE : Acquire and Install Electrical Emergency Generator
ST EQ IN : Install Wind Cone/Segmented Circle
ST EQ MS : Construct Apron
ST EQ RF : Conduct Miscellaneous Study
ST EQ SE : Construct ARFF Building
ST EQ SE : Construct New Airport
ST EQ SN : Acquire Snow Removal Equipment
ST EQ WX : Install Weather Reporting Equipment
Location Type:
Select One
General Information
Building
Runway
Taxiway
Apron
Access Road
Equipment
Seaplane Base
Airport Leasing
Location:
N/A
Estimated Cost:
$900,000
Description:
Purchase snow removal equipment (model year 2003) and ARFF vehicle (model year 2012) to replace the equipment that has reached the end of its useful life and to meet the operational safety needs of the airport.
Priority:
Short
Need Origination:
M&O
Select One
5010
ALP/Master Plan
Community
FAA Initiatives
Inspection
Letter of Compliance
M&O
Other
Sponsor
State Equipment Fleet (SEF)
Justification:
The expected life of each asset is determined by Statewide Equipment fleet and is based on age, usage, and maintenance cost. The airport has exceeded the life of these assets and replacement equipment is required in order to meet safety and FAA AC 150/5200-30D clearance times. This equipment will benefit airfield users while providing safety for the travelling public.
Notes:
Last Edit Date:
11/30/2022 04:24 PM
History Log
Jodi Gould
Need Created
11/30/2022 04:24 PM
Jodi Gould
In Project
12/1/2022 04:23 PM
Kari Hebert
Obligated Need
8/13/2024 10:02 AM