Return to Alaska ASP
Alaska Department of Transportation and Public Facilities
ALASKA AVIATION DATABASE
a component of the
Alaska Aviation System Plan
Facilities
Reports
Dashboard
>
Facilities
General
Runways/Helipads
PCI/Surface Condition
Buildings/Equipment
Services/Navcom
Statistics
CIMP Inspection
Needs
Documents/Links
Facility Photos
Performance Measures
PFAS
AIP Grants
NOTAMs
Contacts
Need Overview
Need Name:
Reconstruct South Deicing Basin
Type:
AIP/M&O AIP
Community/Economic Development
Funding Source:
Select One
State GF
AIP
M&O AIP
M&O Operating
Stimulus
Local
Bond
N/A
Category:
Select One
APRON
BUILDING
EQUIPMENT
FENCING
GROUND TRANSPORTATION
HELIPAD
LEASING
NEW AIRPORT
OTHER
PLANNING
RUNWAY
SEAPLANE BASE
TAXIWAY
Sub Category:
Select One
Acquire Mobile ARFF Training Facility
Construct ARFF Training Facility
Construct Deicing Containment Facility (Environmental)
Construct Deicing Containment Facility (Standards)
Construct Infrastructure to Support WAAS Approach
Construct Parking Lot
Construct Utilities (Airfield)
Construct Utilities (Building)
Environmental Mitigation
Improve Airport Drainage
Improve Airport Erosion Control
Improve Airport Miscellaneous Improvements
Improve Utilities (Airfield)
Improve Utilities (Building)
Install Airfield Guidance Signs
Install Airport Beacons
Install Guidance Signs
Install Miscellaneous NAVAIDS
Install Noise Monitoring System
Install Runways Incursion Caution Bars
Install Signs
Light Obstructions
Mark Obstructions
Rehabilitate Airport Beacons
Rehabilitate Parking Lot
Relocate Landfill
Remove Obstructions (Airfield)
Remove Obstructions (M&O)
Remove Obstructions to Permit WAAS Approach
Remove Signs
Repair Utilities (Airfield)
Repair Utilities (Building)
Runway Incursion Markings
Estimated Cost:
$3,000,000
Description:
This project will reconstruct the south deicing basin as it’s beginning to lose containment of deicing fluid.
Priority:
Short
Need Origination:
M&O
Select One
5010
ALP/Master Plan
Community
FAA Initiatives
Inspection
Letter of Compliance
M&O
Other
Sponsor
State Equipment Fleet (SEF)
Justification:
The project will replace the containment basin as well as all associated piping. The south deicing basin was constructed over 15 years ago and is starting to fail due to the interiors harsh climate and repeated freeze thaw cycles.
Notes:
Last Edit Date:
11/30/2022 04:22 PM
History Log
Jodi Gould
Need Created
11/30/2022 04:22 PM
Jodi Gould
In Project
11/30/2022 04:40 PM
Jodi Gould
Need Created
12/9/2022 02:02 PM
Removed from project.
Jodi Gould
In Project
12/9/2022 02:09 PM