Need Overview
Need Name:
Strengthen North Terminal Apron
Type:
AIP/M&O AIP
Community/Economic Development
Funding Source:
Select One
State GF
AIP
M&O AIP
M&O Operating
Stimulus
Local
Bond
N/A
Category:
Select One
APRON
BUILDING
EQUIPMENT
FENCING
GROUND TRANSPORTATION
HELIPAD
LEASING
NEW AIRPORT
OTHER
PLANNING
RUNWAY
SEAPLANE BASE
TAXIWAY
Sub Category:
Select One
Construct Apron
Construct Blast Pad
Construct Hard Stands
Demolish Apron
Expand Apron
Install Apron Lighting
Rehabilitate Apron
Relocate Apron
Strengthen Apron
Estimated Cost:
$4,000,000
Description:
Strengthen a portion of the north terminal apron to support larger aircraft.
Priority:
Short
Need Origination:
M&O
Select One
5010
ALP/Master Plan
Community
FAA Initiatives
Inspection
Letter of Compliance
M&O
Other
Sponsor
State Equipment Fleet (SEF)
Justification:
With Ravn (regional commuter) cancelling all scheduled service to FAI in 2021 the airport has been left with vacant ramp space at Gates A &B that could be utilized by summer carriers and help alleviate gate constraint issues. Currently, the pavement is not sufficient for design group III or larger aircraft and would need to be strengthened. This would allow the airport to be able to utilize this ramp space for summer passenger operations and winter cargo tech stop flights.
Notes:
Last Edit Date:
11/30/2022 04:19 PM
History Log
Jodi Gould
Need Created
11/30/2022 04:19 PM
Jodi Gould
In Project
11/30/2022 04:38 PM
Jodi Gould
Need Created
12/5/2022 10:17 AM
Removed from project.
Jodi Gould
In Project
12/5/2022 10:27 AM