Need Overview
Need Name:
Install Miscellaneous NAVAIDS
Type:
AIP/M&O AIP
Community/Economic Development
Funding Source:
Select One
State GF
AIP
M&O AIP
M&O Operating
Stimulus
Local
Bond
N/A
Category:
Select One
APRON
BUILDING
EQUIPMENT
FENCING
GROUND TRANSPORTATION
HELIPAD
LEASING
NEW AIRPORT
OTHER
PLANNING
RUNWAY
SEAPLANE BASE
TAXIWAY
Sub Category:
Select One
Acquire Mobile ARFF Training Facility
Construct ARFF Training Facility
Construct Deicing Containment Facility (Environmental)
Construct Deicing Containment Facility (Standards)
Construct Infrastructure to Support WAAS Approach
Construct Parking Lot
Construct Utilities (Airfield)
Construct Utilities (Building)
Environmental Mitigation
Improve Airport Drainage
Improve Airport Erosion Control
Improve Airport Miscellaneous Improvements
Improve Utilities (Airfield)
Improve Utilities (Building)
Install Airfield Guidance Signs
Install Airport Beacons
Install Guidance Signs
Install Miscellaneous NAVAIDS
Install Noise Monitoring System
Install Runways Incursion Caution Bars
Install Signs
Light Obstructions
Mark Obstructions
Rehabilitate Airport Beacons
Rehabilitate Parking Lot
Relocate Landfill
Remove Obstructions (Airfield)
Remove Obstructions (M&O)
Remove Obstructions to Permit WAAS Approach
Remove Signs
Repair Utilities (Airfield)
Repair Utilities (Building)
Runway Incursion Markings
Estimated Cost:
$178,200
Description:
All necessary NAVAIDS will be installed or replaced as part of the runway and RSA widening.
Priority:
Mid
Need Origination:
Inspection
Select One
5010
ALP/Master Plan
Community
FAA Initiatives
Inspection
Letter of Compliance
M&O
Other
Sponsor
State Equipment Fleet (SEF)
Justification:
NAVAIDS will need to be moved and replaced as part of the runway and RSA widening.
Notes:
Last Edit Date:
9/16/2022 03:41 PM
History Log
Mark Eisenman
Need Created
9/16/2022 03:41 PM
Mark Eisenman
In Project
9/16/2022 03:52 PM
Mark Eisenman
Need Created
9/26/2022 12:03 PM
Removed from project.
Mark Eisenman
In Project
9/26/2022 12:06 PM
Inspection Photos