Return to Alaska ASP
Alaska Department of Transportation and Public Facilities
ALASKA AVIATION DATABASE
a component of the
Alaska Aviation System Plan
Facilities
Reports
Air Carriers
Dashboard
>
Facilities
General
Runways/Helipads
PCI/Surface Condition
Buildings/Equipment
Services/Navcom
Statistics
CIMP Inspection
Needs
Documents/Links
Facility Photos
Performance Measures
PFAS
AIP Grants
NOTAMs
Contacts
Need Overview
Need Name:
Obstruction Removal
Type:
AIP
Community/Economic Development
M&O Operating
Funding Source:
Select One
State GF
AIP
M&O Operating
Stimulus
N/A
Category:
Select One
Access Road
Airfield
Airport Master Planning
Airside
Apron
ARPA
Building
Building and Equipment (Control Tower)
CARES Act
CRRSA Act
Equipment
Financing
Ground Transportation
Helipad/Heliport
Homes
Land
Landside
Metro Area Planning
Multi Modal
New Airport
Noise
Other
People Mover
Planning
Privatization Planning
Public Building
Rail
Revenue Producing
Runway
Sealane
Seaplane Base
Service/Perimeter Road
State Block Grant Program
State/Regional Planning
Taxilane
Taxiway
Terminal
Sub Category:
Select One
Acquire Handicap Passenger Lift Device
Acquire Passenger/Handicap Passenger Lift Device
Construct Terminal Building
Construct Terminal Building
Construct Terminal Building
Construct Terminal People Mover
Expand Terminal Building
Expand Terminal Building
Expand Terminal Building
Expand Terminal People Mover
Improve/Modify Terminal
Improve/Modify/Rehabilitate Terminal Building
Improve/Modify/Rehabilitate Terminal Building
Install Security Cameras
Install Terminal Gate Position Lead-in Lights
Reconstruct Terminal Building
Rehabilitate Terminal Building
Rehabilitate Terminal People Mover
Terminal (PFC only: Gates and Related Areas)
Estimated Cost:
$500,000
Description:
Rehabilitate airfield operational surfaces (runway, taxiway, and apron), extend the partial parallel taxiway to the full runway length, obstruction removal, and provide erosion protection. Retrieving data. Wait a few seconds and try to cut or copy again. Also to be removed are Part 77 obstructions (trees).
Priority:
Short
Need Origination:
Sponsor
Select One
5010
ALP/Master Plan
Community
FAA Initiatives
Inspection
Letter of Compliance
M&O
Other
Sponsor
State Equipment Fleet (SEF)
Justification:
Heavy maintenance is needed at this airport, as well as extending the partial parallel taxiway to a full parallel taxiway. Erosion protection is needed at several points along Glacier Creek to protect the RSA and runway. The last major project was rehabilitating the runway and was awarded in 2002. A surface maintenance grant was awarded in 2006 for runway surface preservation.
Notes:
12/31/2019 CIP Datasheet Jessica Wuttke-Campoamor 7/14/2022 10:07 AM
Last Edit Date:
7/18/2022 02:57 PM
History Log
Jessica Wuttke-Campoamor
Need Created
7/14/2022 10:07 AM