Need Overview
Need Name:
Conduct Airport Master Plan
Type:
AIP/M&O AIP
Community/Economic Development
Funding Source:
Select One
State GF
AIP
M&O AIP
M&O Operating
Stimulus
Local
Bond
N/A
Category:
Select One
APRON
BUILDING
EQUIPMENT
FENCING
GROUND TRANSPORTATION
HELIPAD
LEASING
NEW AIRPORT
OTHER
PLANNING
RUNWAY
SEAPLANE BASE
TAXIWAY
Sub Category:
Select One
Acquire Easement For Approaches
Acquire Easement for Development
Acquire Easement for Noise Compatibility
Acquire Land For Approaches
Acquire Land for Development
Acquire Land for Noise Compatibility
Acquire Miscellaneous Land
Conduct Aeronautical Survey
Conduct Aeronautical Survey for WAAS Approach
Conduct Airport Master Plan Study
Conduct ALP Update
Conduct Environmental Study
Conduct Ground Transportation Study
Conduct Metropolitan System Plan Study
Conduct Miscellaneous Study
Conduct Noise Compatibility Plan Study
Conduct State System Plan Study
Conduct Vertiport Plan
Construct New ALP
Environmental Action
Identify the Airport's Environmental Footprint
Noise Mitigation Measures
Noise Mitigation Measures for Public Buildings
Noise Mitigation Measures for Residences
Obstruction Survey
Obtain Wind Data
Prepare SMS Manual and Implementation Plan
Resolve Right of Way Issues
Update Airport Master Plan Study
Update Metropolitan System Plan Study
Update Miscellaneous Study
Update State System Plan Study
Wildlife Control
Wildlife Hazard Assessments
Estimated Cost:
$590,625
Description:
Conduct an ALP update and wind study at Hope Airport.
Priority:
Mid
Need Origination:
Sponsor
Select One
5010
ALP/Master Plan
Community
FAA Initiatives
Inspection
Letter of Compliance
M&O
Other
Sponsor
State Equipment Fleet (SEF)
Justification:
We are getting lease applications that we have to reject due to no available space on the apron. Pilots have been using a location west of the runway to park their planes, but it is not an official apron, it does not meet FAA setback requirements, and we have been written up by the FAA for this issue. The previous ALP was not based on wind data, just a quick update, so a wind study is necessary to confirm the alignment before we build a larger, much needed apron.
Notes:
Last Edit Date:
6/13/2022 01:38 PM
History Log
Rebecca Douglas
Need Created
6/13/2022 01:02 PM
Rebecca Douglas
In Project
6/13/2022 01:38 PM