Need Name:
Wider Vehicle Gate
Type:
AIP/M&O AIP
Community/Economic Development
Funding Source:
Select One
State GF
AIP
M&O AIP
M&O Operating
Stimulus
Local
Bond
N/A
Category:
Select One
APRON
BUILDING
EQUIPMENT
FENCING
GROUND TRANSPORTATION
HELIPAD
LEASING
NEW AIRPORT
OTHER
PLANNING
RUNWAY
SEAPLANE BASE
TAXIWAY
Sub Category:
Select One
Extend Fencing
Install Fencing/Gates
Install Perimeter Fencing
Relocate Fencing
Repair Fencing/Gates
Estimated Cost:
$362,345
Description:
Install a wider, automated, vehicle gate for DOT&PF. The new gate should be at least 20-feet wide.
Priority:
Short
Need Origination:
Sponsor
Select One
5010
ALP/Master Plan
Community
FAA Initiatives
Inspection
Letter of Compliance
M&O
Other
Sponsor
State Equipment Fleet (SEF)
Justification:
The existing gate only allows 2 inches of clearance on each side when bringing the broom onto the airport and the broom must be angled to get even the 2 inch clearances. Eventually, they will damage a post and the deer will get onto the runway. The gate needs to be automated because there is a lot of vehicle traffic through this gate and there are a lot of deer. An open gate is the only way deer can enter the airport and the consequences can be deadly. Without gate automation, gates are likely to be left open with no ability to trace back to the person who left it open.
Notes:
Last Edit Date:
2/16/2024 10:13 AM
History Log
Paul Khera
Need Created
5/25/2022 02:07 PM
Paul Khera
In Project
12/20/2023 11:40 AM
Paul Khera
Need Created
2/16/2024 10:03 AM
Removed from project.
Paul Khera
In Project
2/16/2024 10:32 AM