Return to Alaska ASP
Alaska Department of Transportation and Public Facilities
ALASKA AVIATION DATABASE
a component of the
Alaska Aviation System Plan
Facilities
Reports
Air Carriers
Links
Dashboard
>
Facilities
General
Runways/Helipads
PCI/Surface Condition
Buildings/Equipment
Services/Navcom
Statistics
CIMP Inspection
Land Occupancy/Leasing
Needs
Documents/Links
Facility Photos
Performance Measures
PFAS
AIP Grants
NOTAMs
Communities
Contacts
Need Overview
Need Name:
ALP update and wind study
Common Name:
ALP update and wind study
Type:
AIP
Community/Economic Development
M&O Operating
Funding Source:
Select One
State GF
AIP
IARF
M&O Operating
Stimulus
PFC
N/A
Component:
Select One
Access Road
Airfield
Airport Master Planning
Apron Projects
Building and Equipment
Building Projects (other than terminals)
Equipment, Security, and Fencing
Fence
Ground Transportation Projects
Heliport/Helipad Projects
Land Acquisition (other than noise land)
New Airport Projects
Noise Mitigation Measures for Public Buildings
Noise Projects (other than planning)
Other Projects
People Mover
Planning Projects
Privatizaton Planning
Revenue Producing
Runway Projects
Seaplane Base Projects
Service/Perimeter Road
State/Regional Planning
Taxilane
Taxiway Projects
Terminal Projects
Vertiport Projects
Work Code:
EN MA ES : Conduct Environmental Impact Statement
PL MA MS : Conduct/Update Miscellaneous Study
PL MA NP : Develop New Airport Master Plan
PL MA NP : Develop New Solid Waste Recycling Plan
PL MA NP : Develop Sustainable Master Plan
PL MA UP : Update Airport Master Plan
PL MA VI : Conduct Aeronautical Survey for RNAV Approach
PL MA WH : Airport Wildlife Hazard Assessment/Site Visit/Management Plan
Location Type:
Select One
General Information
Building
Runway
Taxiway
Apron
Access Road
Equipment
Seaplane Base
Airport Leasing
Location:
N/A
Estimated Cost:
$630,000
Description:
The scope will include a wind study and airport layout plan (ALP). If an updated ultimate plan is warranted, based on the analysis of the new wind data, a new ALP will be developed to incorporate the wind data. If an updated plan is not warranted, the existing ALP will be as-built with the wind data.
Priority:
Mid
Need Origination:
Sponsor
Select One
5010
ALP/Master Plan
Community
FAA Initiatives
Inspection
Letter of Compliance
M&O
Other
Sponsor
State Equipment Fleet (SEF)
Justification:
The Kongiganak Airport does not have weather equipment and weather data from the Quinhagak Airport has been used on the most recent ALP. The Quinhagak Airport data shows the Kongignanak Airport does not have 95% wind coverage and a wind study is needed before implementing ultimate improvements at this remote airport. This update will perform a wind study to validate the current alignment for the runway and develop a new ALP, if needed, or as-built the existing ALP with the current wind data.
Notes:
Need identified by Aviation Design CIPDS submitted to FAA on 3/30/2022
Last Edit Date:
5/25/2022 12:50 PM
History Log
Jessica Wuttke-Campoamor
Need Created
5/25/2022 12:50 PM
Jessica Wuttke-Campoamor
In Project
5/25/2022 12:51 PM