Need Name:
Erosion Control for Round Top Valley Creek
Type:
AIP/M&O AIP
Community/Economic Development
Funding Source:
Select One
State GF
AIP
M&O AIP
M&O Operating
Stimulus
Local
Bond
N/A
Category:
Select One
APRON
BUILDING
EQUIPMENT
FENCING
GROUND TRANSPORTATION
HELIPAD
LEASING
NEW AIRPORT
OTHER
PLANNING
RUNWAY
SEAPLANE BASE
TAXIWAY
Sub Category:
Select One
Acquire Mobile ARFF Training Facility
Construct ARFF Training Facility
Construct Deicing Containment Facility (Environmental)
Construct Deicing Containment Facility (Standards)
Construct Infrastructure to Support WAAS Approach
Construct Parking Lot
Construct Utilities (Airfield)
Construct Utilities (Building)
Environmental Mitigation
Improve Airport Drainage
Improve Airport Erosion Control
Improve Airport Miscellaneous Improvements
Improve Utilities (Airfield)
Improve Utilities (Building)
Install Airfield Guidance Signs
Install Airport Beacons
Install Guidance Signs
Install Miscellaneous NAVAIDS
Install Noise Monitoring System
Install Runways Incursion Caution Bars
Install Signs
Light Obstructions
Mark Obstructions
Rehabilitate Airport Beacons
Rehabilitate Parking Lot
Relocate Landfill
Remove Obstructions (Airfield)
Remove Obstructions (M&O)
Remove Obstructions to Permit WAAS Approach
Remove Signs
Repair Utilities (Airfield)
Repair Utilities (Building)
Runway Incursion Markings
Estimated Cost:
$2,972,074
Description:
Install an erosion control wall for Round Top Valley Creek.
Priority:
Short
Need Origination:
Inspection
Select One
5010
ALP/Master Plan
Community
FAA Initiatives
Inspection
Letter of Compliance
M&O
Other
Sponsor
State Equipment Fleet (SEF)
Justification:
The creek continues to widen and erode airport property. Eventually it will take out the FAA's NAVAID facilities and our Runway 14 end. This should be combined with the next runway resurfacing project.
Notes:
Last Edit Date:
9/29/2022 07:37 AM
History Log
Paul Khera
Need Created
5/24/2022 11:50 AM
Paul Khera
In Project
5/24/2022 11:50 AM
Rebecca Douglas
Need Created
9/29/2022 07:37 AM
Removed from project.
Rebecca Douglas
In Project
9/29/2022 07:38 AM