Return to Alaska ASP
Alaska Department of Transportation and Public Facilities
ALASKA AVIATION DATABASE
a component of the
Alaska Aviation System Plan
Facilities
Reports
Dashboard
>
Facilities
General
Runways/Helipads
PCI/Surface Condition
Buildings/Equipment
Services/Navcom
Statistics
CIMP Inspection
Needs
Documents/Links
Facility Photos
Performance Measures
PFAS
AIP Grants
NOTAMs
Contacts
Need Overview
Need Name:
Install Full Perimeter Fence
Type:
AIP/M&O AIP
Community/Economic Development
Funding Source:
Select One
State GF
AIP
M&O AIP
M&O Operating
Stimulus
Local
Bond
N/A
Category:
Select One
APRON
BUILDING
EQUIPMENT
FENCING
GROUND TRANSPORTATION
HELIPAD
LEASING
NEW AIRPORT
OTHER
PLANNING
RUNWAY
SEAPLANE BASE
TAXIWAY
Sub Category:
Select One
Extend Fencing
Install Fencing/Gates
Install Perimeter Fencing
Relocate Fencing
Repair Fencing/Gates
Estimated Cost:
$2,000,000
Description:
Extended fence lines to fully enclose the airport.
Priority:
Short
Need Origination:
Inspection
Select One
5010
ALP/Master Plan
Community
FAA Initiatives
Inspection
Letter of Compliance
M&O
Other
Sponsor
State Equipment Fleet (SEF)
Justification:
For the purposes of wildlife hazard mitigation as well as safety and security the fence needs to fully enclose the operational surfaces of the airport.
Notes:
Last Edit Date:
3/16/2022 02:43 PM
History Log
Rebecca Douglas
In Project
3/16/2022 02:43 PM
Inspection Photos