Return to Alaska ASP
Alaska Department of Transportation and Public Facilities
ALASKA AVIATION DATABASE
a component of the
Alaska Aviation System Plan
Facilities
Reports
Air Carriers
Links
Dashboard
>
Facilities
General
Runways/Helipads
PCI/Surface Condition
Buildings/Equipment
Services/Navcom
Statistics
CIMP Inspection
Land Occupancy/Leasing
Needs
Documents/Links
Facility Photos
Performance Measures
PFAS
AIP Grants
NOTAMs
Communities
Contacts
Need Overview
Need Name:
Construct Floatplane Ramp and Access Road
Common Name:
Construct Floatplane Ramp and Access Road
Type:
AIP
Community/Economic Development
M&O Operating
Funding Source:
Select One
State GF
AIP
IARF
M&O Operating
Stimulus
PFC
N/A
Component:
Select One
Access Road
Airfield
Airport Master Planning
Apron Projects
Building and Equipment
Building Projects (other than terminals)
Equipment, Security, and Fencing
Fence
Ground Transportation Projects
Heliport/Helipad Projects
Land Acquisition (other than noise land)
New Airport Projects
Noise Mitigation Measures for Public Buildings
Noise Projects (other than planning)
Other Projects
People Mover
Planning Projects
Privatizaton Planning
Revenue Producing
Runway Projects
Seaplane Base Projects
Service/Perimeter Road
State/Regional Planning
Taxilane
Taxiway Projects
Terminal Projects
Vertiport Projects
Work Code:
Select One
Location Type:
Select One
General Information
Building
Runway
Taxiway
Apron
Access Road
Equipment
Seaplane Base
Airport Leasing
Location:
N/A
Estimated Cost:
$257,500
Description:
A simple floatplane ramp and hardened access road will be developed at the Aniak Slough access point. The project will provide a wide, hardened ramp for the launch and removal of floatplanes from the water. The access road will be hardened to prevent erosion and damage to the dike from vehicular traffic. Trees and other vegetation will be removed along the road to avoid damage to the wings of aircraft being towed to the apron. The portions of the dike near the floatplane ramp will receive limited repairs to raise the dike to its original height and to address existing damage from past vehicular traffic on the dike. Fencing or other access restrictions will be installed to prevent future vehicular damage to the dike.
Priority:
Mid
Need Origination:
ALP/Master Plan
Select One
5010
ALP/Master Plan
Community
FAA Initiatives
Inspection
Letter of Compliance
M&O
Other
Sponsor
State Equipment Fleet (SEF)
Justification:
Notes:
Last Edit Date:
9/7/2021 01:20 PM
History Log
Philana Miles
Need Created
9/7/2021 01:15 PM