Need Name:
Erosion Protection and Levee Rehabilitation
Type:
AIP/M&O AIP
Community/Economic Development
Funding Source:
Select One
State GF
AIP
M&O AIP
M&O Operating
Stimulus
Local
Bond
N/A
Category:
Select One
APRON
BUILDING
EQUIPMENT
FENCING
GROUND TRANSPORTATION
HELIPAD
LEASING
NEW AIRPORT
OTHER
PLANNING
RUNWAY
SEAPLANE BASE
TAXIWAY
Sub Category:
Select One
Acquire Mobile ARFF Training Facility
Construct ARFF Training Facility
Construct Deicing Containment Facility (Environmental)
Construct Deicing Containment Facility (Standards)
Construct Infrastructure to Support WAAS Approach
Construct Parking Lot
Construct Utilities (Airfield)
Construct Utilities (Building)
Environmental Mitigation
Improve Airport Drainage
Improve Airport Erosion Control
Improve Airport Miscellaneous Improvements
Improve Utilities (Airfield)
Improve Utilities (Building)
Install Airfield Guidance Signs
Install Airport Beacons
Install Guidance Signs
Install Miscellaneous NAVAIDS
Install Noise Monitoring System
Install Runways Incursion Caution Bars
Install Signs
Light Obstructions
Mark Obstructions
Rehabilitate Airport Beacons
Rehabilitate Parking Lot
Relocate Landfill
Remove Obstructions (Airfield)
Remove Obstructions (M&O)
Remove Obstructions to Permit WAAS Approach
Remove Signs
Repair Utilities (Airfield)
Repair Utilities (Building)
Runway Incursion Markings
Estimated Cost:
$20,291,000
Description:
This project consists primarily of the construction of erosion protection structures along the riverbank at the west end of the airport to prevent long-term damage to the runway and airport facilities. However, a limited amount of riverbank reinforcement may cause new erosion problems along the riverbank. Therefore, the cost estimate for this project assumes that erosion protection will be required along the entire north side of the City of Aniak. Some dike reinforcement may also be necessary along the dike at the east end of the City. Initial ideas for erosion control include sheet-pile walls, riprap, and concrete mats. However, the scope of this project will be determined in large part by the erosion control study recommended in the master plan. Because this project will provide protection for both the City of Aniak and ANI, it may be possible to secure funding from a variety of sources.
Priority:
N/A
Need Origination:
ALP/Master Plan
Select One
5010
ALP/Master Plan
Community
FAA Initiatives
Inspection
Letter of Compliance
M&O
Other
Sponsor
State Equipment Fleet (SEF)
Justification:
A COE inspection of the Aniak levee was conducted on 9/25/2019. Portions of the levee were rated as unacceptable. The levee provides protection from flooding that may impact airport facilities including the access road and other operational surfaces. As the sea levels rise, maintenance of the levee will be imperative for the airport.
Notes:
AMP 2016 ACOE Inspection 9/25/2019 DOT&PF Paul Janke Inspection comments 5/4/2021 The ownership and management of the levee varies between the city and the state making funding mechanism complex. A cost estimate has not been prepared as of 9/7/2021.
Last Edit Date:
9/7/2021 01:21 PM
History Log
Philana Miles
Need Created
9/7/2021 01:02 PM