Return to Alaska ASP
Alaska Department of Transportation and Public Facilities
ALASKA AVIATION DATABASE
a component of the
Alaska Aviation System Plan
Facilities
Reports
Dashboard
>
Facilities
General
Runways/Helipads
PCI/Surface Condition
Buildings/Equipment
Services/Navcom
Statistics
CIMP Inspection
Needs
Documents/Links
Facility Photos
Performance Measures
PFAS
AIP Grants
NOTAMs
Contacts
Need Overview
Need Name:
Improve Airport Drainage/Erosion Control
Type:
AIP/M&O AIP
Community/Economic Development
Funding Source:
Select One
State GF
AIP
M&O AIP
M&O Operating
Stimulus
Local
Bond
N/A
Category:
Select One
APRON
BUILDING
EQUIPMENT
FENCING
GROUND TRANSPORTATION
HELIPAD
LEASING
NEW AIRPORT
OTHER
PLANNING
RUNWAY
SEAPLANE BASE
TAXIWAY
Sub Category:
Select One
Acquire Mobile ARFF Training Facility
Construct ARFF Training Facility
Construct Deicing Containment Facility (Environmental)
Construct Deicing Containment Facility (Standards)
Construct Infrastructure to Support WAAS Approach
Construct Parking Lot
Construct Utilities (Airfield)
Construct Utilities (Building)
Environmental Mitigation
Improve Airport Drainage
Improve Airport Erosion Control
Improve Airport Miscellaneous Improvements
Improve Utilities (Airfield)
Improve Utilities (Building)
Install Airfield Guidance Signs
Install Airport Beacons
Install Guidance Signs
Install Miscellaneous NAVAIDS
Install Noise Monitoring System
Install Runways Incursion Caution Bars
Install Signs
Light Obstructions
Mark Obstructions
Rehabilitate Airport Beacons
Rehabilitate Parking Lot
Relocate Landfill
Remove Obstructions (Airfield)
Remove Obstructions (M&O)
Remove Obstructions to Permit WAAS Approach
Remove Signs
Repair Utilities (Airfield)
Repair Utilities (Building)
Runway Incursion Markings
Estimated Cost:
$753,441
Description:
The project will resurface gravel operational surfaces including the runway, apron, and segmented circle access to repair differential settlement cracking, soft spots, ruts, and potholes, and provide positive drainage offsite. Construct a new taxilane to the area east of the existing apron and just north of the existing SREB to provide access to potential lease lots. Apply a dust palliative to operational surfaces. Replace undersized, failing culverts and regrade ditches to improve drainage and minimize freeze-thaw effects.
Priority:
ASAP
Need Origination:
Inspection
Select One
5010
ALP/Master Plan
Community
FAA Initiatives
Inspection
Letter of Compliance
M&O
Other
Sponsor
State Equipment Fleet (SEF)
Justification:
The gravel surface course is in poor condition with observations including erosion, varying consistency of gravel and fines content, undesirable depressions and humps resulting in ponding, minimal surface variations, differential settlement cracking, soft spots, wheel ruts, potholes, and an uncompacted surface. Other observations include failing culverts not functioning as intended, ponding due to undesirable low spots, and detrimental effects related to freeze-thaw cycles and poor drainage.
Notes:
CIP datasheet developed 9/9/2021. ST AF DR.
Last Edit Date:
9/20/2021 04:00 PM
History Log
Joselyn Biloon
In Project
9/20/2021 10:39 AM
Jessica Wuttke-Campoamor
Need Created
9/20/2021 03:51 PM
Removed from project.
Jessica Wuttke-Campoamor
In Project
9/20/2021 04:02 PM
Inspection Photos