Return to Alaska ASP
Alaska Department of Transportation and Public Facilities
ALASKA AVIATION DATABASE
a component of the
Alaska Aviation System Plan
Facilities
Reports
Dashboard
>
Facilities
General
Runways/Helipads
PCI/Surface Condition
Buildings/Equipment
Services/Navcom
Statistics
CIMP Inspection
Needs
Documents/Links
Facility Photos
Performance Measures
PFAS
AIP Grants
NOTAMs
Contacts
Need Overview
Need Name:
Rehabilitate Apron
Type:
AIP/M&O AIP
Community/Economic Development
Funding Source:
Select One
State GF
AIP
M&O AIP
M&O Operating
Stimulus
Local
Bond
N/A
Category:
Select One
APRON
BUILDING
EQUIPMENT
FENCING
GROUND TRANSPORTATION
HELIPAD
LEASING
NEW AIRPORT
OTHER
PLANNING
RUNWAY
SEAPLANE BASE
TAXIWAY
Sub Category:
Select One
Construct Apron
Construct Blast Pad
Construct Hard Stands
Demolish Apron
Expand Apron
Install Apron Lighting
Rehabilitate Apron
Relocate Apron
Strengthen Apron
Estimated Cost:
$1,421,400
Description:
Rehabilitate and resurface apron and other airfield operational surfaces to correct cracks, ruts, uneven surfaces, dips, soft spots, and ponding. Apply dust palliative. Drainage improvements may include ditching and culvert alignment. Lighting and visual aids will be repaired or replaced where damaged by subsidence.
Priority:
Short
Need Origination:
Inspection
Select One
5010
ALP/Master Plan
Community
FAA Initiatives
Inspection
Letter of Compliance
M&O
Other
Sponsor
State Equipment Fleet (SEF)
Justification:
The airport operating areas and access road are in need of repair. Poor drainage and differential settling have caused frequent and significant depressions, cracking and humps, ruts, uneven surfaces, dips over 6", soft spots, ponding, and shoulder erosion. The lighting system and visual navaids have been damaged or displaced by subsidence. There have been 9 NOTAMs and runway closures since March 2017. No surface maintenance grants have been awarded to this airport since it was constructed in 2013.
Notes:
12/31/2019 CIP Datasheet Superseded 2/26/2021 CIP Datasheet (submitted with APEB package)
Last Edit Date:
1/24/2022 02:41 PM
History Log
Philana Miles
Need Created
3/1/2021 01:57 PM
Philana Miles
In Project
3/16/2021 10:44 AM
Inspection Photos