Need Name:
Construct New SREB and EEB
Type:
AIP/M&O AIP
Community/Economic Development
Funding Source:
Select One
State GF
AIP
M&O AIP
M&O Operating
Stimulus
Local
Bond
N/A
Category:
Select One
APRON
BUILDING
EQUIPMENT
FENCING
GROUND TRANSPORTATION
HELIPAD
LEASING
NEW AIRPORT
OTHER
PLANNING
RUNWAY
SEAPLANE BASE
TAXIWAY
Sub Category:
Select One
Acquire Handicap Passenger Lift Device
Construct ARFF Building
Construct Building
Construct Passenger Shelter
Construct Sand and Chemical Storage Building
Construct SREB
Construct Terminal Building
Construct Toilet Facilities
Demolish Building
Expand ARFF Building
Expand Building
Expand Sand and Chemical Storage Building
Expand SREB
Expand Terminal Building
Hazmat Removal
Improve ARFF Building
Improve Building
Improve Sand and Chemical Storage Building
Improve SREB
Improve Terminal Building
Modify ARFF Building
Modify Building
Modify Sand and Chemical Storage Building
Modify SREB
Rehabilitate ARFF Building
Rehabilitate Building
Rehabilitate Sand and Chemical Storage Building
Rehabilitate SREB
Relocate Building
Estimated Cost:
$1,802,500
Description:
Construct a new SREB that includes an electrical equipment room at the Wales Airport. M&O has requested a new 2,200 sf. or larger structure with an electrical equipment room, and would like to replace fuel tanks and include security fencing around them.
Priority:
Mid
Need Origination:
Inspection
Select One
5010
ALP/Master Plan
Community
FAA Initiatives
Inspection
Letter of Compliance
M&O
Other
Sponsor
State Equipment Fleet (SEF)
Justification:
Existing SREB was constructed in 1985 and is in poor condition. The building condition has deteriorated in the two years since the last CIMP inspection (2015). Building issues include an overhead door that does not seal properly, an interior in need of painting, a concrete floor in poor condition with cracks and heaving, and inefficient building lighting. The building’s exterior siding is in poor shape, the equipment fuel tank is in poor condition and there is a need for security fencing around the tanks. Additionally, grading is needed to improve drainage away from the building.
Notes:
M&O has requested a new 2,200 sf. or larger structure with an electrical equipment room, and would like to replace fuel tanks and include security fencing around them.
Last Edit Date:
2/9/2021 08:43 PM
History Log
SWA Update
Need Created
2/9/2021 08:43 PM
SWA Update
In Project
2/9/2021 08:45 PM
Inspection Photos