Return to Alaska ASP
Alaska Department of Transportation and Public Facilities
ALASKA AVIATION DATABASE
a component of the
Alaska Aviation System Plan
Facilities
Reports
Dashboard
>
Facilities
General
Runways/Helipads
PCI/Surface Condition
Buildings/Equipment
Services/Navcom
Statistics
CIMP Inspection
Needs
Documents/Links
Facility Photos
Performance Measures
PFAS
AIP Grants
NOTAMs
Contacts
Need Overview
Need Name:
Install perimeter fencing
Type:
AIP/M&O AIP
Community/Economic Development
Funding Source:
Select One
State GF
AIP
M&O AIP
M&O Operating
Stimulus
Local
Bond
N/A
Category:
Select One
APRON
BUILDING
EQUIPMENT
FENCING
GROUND TRANSPORTATION
HELIPAD
LEASING
NEW AIRPORT
OTHER
PLANNING
RUNWAY
SEAPLANE BASE
TAXIWAY
Sub Category:
Select One
Extend Fencing
Install Fencing/Gates
Install Perimeter Fencing
Relocate Fencing
Repair Fencing/Gates
Estimated Cost:
$509,232
Description:
Perimeter fencing needs to be installed to help manage wildlife intrusions.
Priority:
Mid
Need Origination:
Inspection
Select One
5010
ALP/Master Plan
Community
FAA Initiatives
Inspection
Letter of Compliance
M&O
Other
Sponsor
State Equipment Fleet (SEF)
Justification:
The 2017 CIMP inspection gives the Goodnews Airport the grade of an “F” in the category of wildlife, pointing out wildlife attracting habitat, known wildlife hazards, and no active measures being taken to repel wildlife. The 2017 5010 report notes that the airport is unsecured, pointing out the presence of “moose, bears, and caribou” on and around the airport.
Notes:
Last Edit Date:
9/23/2020 12:43 PM
History Log
Shawn Gardner
Need Created
9/23/2020 12:43 PM
Shawn Gardner
In Project
9/28/2020 10:32 AM
Inspection Photos