Return to Alaska ASP
Alaska Department of Transportation and Public Facilities
ALASKA AVIATION DATABASE
a component of the
Alaska Aviation System Plan
Facilities
Reports
Dashboard
>
Facilities
General
Runways/Helipads
PCI/Surface Condition
Buildings/Equipment
Services/Navcom
Statistics
CIMP Inspection
Needs
Documents/Links
Facility Photos
Performance Measures
PFAS
AIP Grants
NOTAMs
Contacts
Need Overview
Need Name:
Rehabilitate apron
Type:
AIP/M&O AIP
Community/Economic Development
Funding Source:
Select One
State GF
AIP
M&O AIP
M&O Operating
Stimulus
Local
Bond
N/A
Category:
Select One
APRON
BUILDING
EQUIPMENT
FENCING
GROUND TRANSPORTATION
HELIPAD
LEASING
NEW AIRPORT
OTHER
PLANNING
RUNWAY
SEAPLANE BASE
TAXIWAY
Sub Category:
Select One
Construct Apron
Construct Blast Pad
Construct Hard Stands
Demolish Apron
Expand Apron
Install Apron Lighting
Rehabilitate Apron
Relocate Apron
Strengthen Apron
Estimated Cost:
$636,540
Description:
Resurface operational surfaces and provide erosion protection.
Priority:
Mid
Need Origination:
Other
Select One
5010
ALP/Master Plan
Community
FAA Initiatives
Inspection
Letter of Compliance
M&O
Other
Sponsor
State Equipment Fleet (SEF)
Justification:
Heavy maintenance is needed at this airport for safety. This airport was constructed in 2007. There have not been surface maintenance grants awarded for preventative and preservation maintenance of the operational surfaces since the relocation. The airfield lighting system has not been updated since the construction and is beyond its useful life (10 years).
Notes:
Need originated from the 12/31/2019 CIP datasheet.
Last Edit Date:
5/5/2020 08:29 AM
History Log