Alaska Department of Transportation and Public Facilities
ALASKA AVIATION DATABASE
a component of the
Alaska Aviation System Plan

Need Overview

Need Name: Drainage
Type:
Funding Source:
Category:
Sub Category:
Estimated Cost: $3,182,700
Description: Remove and replace the 4 culverts under Taxiway A.
Priority: Short
Need Origination: Inspection
Justification: The culverts are causing a rise in the taxiway and that could cause aircraft damage, not to mention damage from improper drainage. The taxiway also needs repaving and the culverts should be replaced at that time.
Notes:
Last Edit Date: 1/20/2021 03:15 PM
History Log

Inspection Photos