Need Overview
Need Name:
Reconstruct taxiway lighting
Type:
AIP
Community/Economic Development
M&O Operating
Funding Source:
Select One
State GF
AIP
M&O Operating
Stimulus
N/A
Category:
Select One
Access Road
Airfield
Airport Master Planning
Airside
Apron
ARPA
Building
Building and Equipment (Control Tower)
CARES Act
CRRSA Act
Equipment
Financing
Ground Transportation
Helipad/Heliport
Homes
Land
Landside
Metro Area Planning
Multi Modal
New Airport
Noise
Other
People Mover
Planning
Privatization Planning
Public Building
Rail
Revenue Producing
Runway
Sealane
Seaplane Base
Service/Perimeter Road
State Block Grant Program
State/Regional Planning
Taxilane
Taxiway
Terminal
Sub Category:
Select One
Estimated Cost:
$190,000
Description:
This project proposes to resurface the the gravel runway, taxiway, apron, and access road. The runway will be upgraded from B-I to A-II standards which results in widening the runway and expanding the safety areas. Improvements include replacement of airfield lighting, markings, signs, and navigational aids.
Priority:
ASAP
Need Origination:
Inspection
Select One
5010
ALP/Master Plan
Community
FAA Initiatives
Inspection
Letter of Compliance
M&O
Other
Sponsor
State Equipment Fleet (SEF)
Justification:
The runway and taxiway need to be upgraded to match the standards of the current critical aircraft grouping of A-II. The runway and taxiway surfaces contain 6-8” dips throughout, and the south end of the runway is experiencing settlement. The runway and taxiway lighting systems are at the end of their useful life and need to be replaced to maintain reliability for operations during nighttime and inclement weather.
Notes:
CIP Data Sheet associated with April 7, 2022 APEB nomination.
Last Edit Date:
3/14/2022 10:35 AM
History Log
Jessica Wuttke-Campoamor
In Project
9/29/2020 07:57 AM
Philana Miles
Need Imported
1/11/2022 11:12 AM
Need Updated Successfully
Philana Miles
Need Created
3/14/2022 09:11 AM
Removed from project.
Philana Miles
In Project
3/14/2022 11:36 AM