Need Name: Reconstruct taxiway lighting
Type:
Funding Source:
Category:
Sub Category:
Estimated Cost: $190,000
Description: This project proposes to resurface the the gravel runway, taxiway, apron, and access road. The runway will be upgraded from B-I to A-II standards which results in widening the runway and expanding the safety areas. Improvements include replacement of airfield lighting, markings, signs, and navigational aids.
Priority: ASAP
Need Origination: Inspection
Justification: The runway and taxiway need to be upgraded to match the standards of the current critical aircraft grouping of A-II. The runway and taxiway surfaces contain 6-8” dips throughout, and the south end of the runway is experiencing settlement. The runway and taxiway lighting systems are at the end of their useful life and need to be replaced to maintain reliability for operations during nighttime and inclement weather.
Notes: CIP Data Sheet associated with April 7, 2022 APEB nomination.
Last Edit Date: 3/14/2022 10:35 AM
History Log
Jessica Wuttke-Campoamor
In Project
9/29/2020 07:57 AM
Philana Miles
Need Imported
1/11/2022 11:12 AM
Need Updated Successfully
Philana Miles
Need Created
3/14/2022 09:11 AM
Removed from project.
Philana Miles
In Project
3/14/2022 11:36 AM